| Plan Review Notes For Permit 04010152 |
| Permit Number |
04010152 |
|
| Review Stop |
B |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2004-02-05 00:00:00 | BUILDING REVIEW APPROVED WITH PROVISO: | | | 1-PROVIDE FLOOR PLANS WITH GARAGE ON | | | LEFT SIDE AS SHOWN ON SURVEY AS REQ'D | | | BY BUILDING OFFICIAL. SEC. 104.2.1.2 | | | CITY AMENDMENTS TO FBC 2001. | | | 2-PROVIDE COMPLETE CURRENT PRODUCT APPRO | | | VAL FOR ALL DOORS, WINDOWS, MULLIONS, | | | GLASS BLOCK, ROOF TILE AND ALL | | | STRUCTURAL CONNECTORS UNDER A SEPARATE | | | PERMIT. | | | 3-CLARIFY/REVISE TRUSS ANCHOR SCHEDULE. | | | 4-TYPICAL WALL SECTION A/4: CLARIFY | | | WHERE ARE TABLES 6 AND 8 FOR ROOF TILE | | | FASTENERS TAKEN FROM?. SEE SECTION | | | 1606.3 FBC 2001 AND SEC. 104.2.1.1 | | | CITY AMENDMENTS TO FBC 2001. | | | 5-SHEET #7: A)REVISE DESIGN PRESSURES ON | | | REAR ELEVATION. | | | B)WINDOWS SHOWN ON ELEVATION DON'T MATCH | | | THE WINDOW SCHEDULE. REVISE AS REQ'D | | | C)REVISE AL NOTES ON FLOOR PLAN AND ROOF | | | FRAMING PLAN TO REFLECT CHANGE OF WOOD | | | BEAM TO CONCRETE. | | | 6-SHEET #3: CLARIFY NOTE REGARDING UP- | | | LIFT CALCS AND CONNECTORS SELECTED. |
|