| Date |
Text |
| 2004-01-31 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | FBC-2001 CHAPTER 11 |
| | |
| | |
| | 1) SHT C-6 GREASE/WATER INTECEPTOR SHALL |
| | BE SIZED BY RODNEY COMPO, ENVIRONMENTAL |
| | COMPLIANCE MGR. PER WASTE ORD. #2938. |
| | PLEASE CONTACT MR. COMPO AT (561) 837- |
| | 4074. |
| | 2) SHOW COMPLIANCE WITH SECTION 11-9.1.2 |
| | ACCESSIBLE UNITS, SLEEPING ROOMS, AND |
| | SUITES. |
| | 3) SHOW COMPLIANCE WITH SECTION 11-9.1.3 |
| | SLEEPING ACCOMMODATIONS FOR PERSONS WITH |
| | HEARING IMPAIRMENTS. |
| | 4) SHOW COMPLIANCE WITH SECTION 11-9.1.4 |
| | CLASSES OF SLEEPING ACCOMMODATIONS. |
| | 5) SHOW COMPLIANCE WITH SECTION 11-9.2.3 |
| | HOTEL, MOTEL AND CONDOMINIUM SPECIAL |
| | ACCESSIBILITY FEATURE. |
| | 6) SHT P-1 MEN'S AND WOMEN'S RESTROOMS |
| | #'S 148 & 135, FLOOR DRAINS ARE NOT VEN- |
| | TED. CORRECT ON THE FLOOR PLAN AND SANT. |
| | RISER DIAGRAM. 901.2.1 |
| | 7) SHT P-1 CLEANOUTS REQUIRED NEAR JUNC- |
| | TION OF BLDG DRAIN AND BLDG SEWER. 2-WAY |
| | C/O'S MAY BE USED. 708.3.5 |
| | 8) SHT P-1 ALL UNITS, ONLY THE FIXTURES |
| | WITHIN THE BATHROOM GROUPS SHALL CONNECT |
| | TO THE WET-VENTED HORIZONTAL BRANCH |
| | DRAIN. KITCHEN SINK SHALL DISCHARGE |
| | DOWN-STREAM OF THE WET VENT. 909.1 |
| | 9) SHT P-1 IDENTIFY SANITARY LINE AND |
| | STACK LOCATED IN WALL BETWEEN BDRM 130 |
| | AND CORRIDOR. IDENTIFY STACK. |
| | 10) SHT P-1 GAS PIPE DROPING DOWN FROM |
| | SHT P-2 BY STAIRWAY #1 NOT SHOWN ON P-1 |
| | SHEET. PLEASE CLAIRFY. 104.2.1 |
| | 11) SHT P-6 TABLE 906.1 MAXIMUM DISTANCE |
| | FROM TRAP TO VENT IS 10 FEET. FLOOR |
| | DRAIN IN MECH. ROOM BACK TO VENT SEEMS |
| | TO EXCEED THIS DISTANCE. |
| | 12) SHT P-7 SANT. RISER S/8 SHOWS FLOOR |
| | SINKS ON 2ND, 3RD, 4TH, & 5TH FLOORS. |
| | SHT P-2 SHOWS S/8 UP TO MEZZ. FLOOR AT |
| | COL. LINE "D" BETWEEN LAUNDRY & ELECTRIC |
| | ROOM BUT NOT SHOWN ABOVE ON SHTS P-3, P- |
| | 4, OR P-5, NOR DOES IT SHOW FLOOR SINKS |
| | ON ANY OF THESE FLOORS. SHT P-8 SHOWS |
| | S/8 PICKING UP A WASH MACHINE AND THEN |
| | VENTING THRU THE ROOF. PLEASE CLAIRFY. |
| | 104.2.1 |
| | 13) A FLOOR DRAIN IS REQUIRED IN THE |
| | LAUNDRY PER SECTION 412.4. |
| | 14) SHT P-7 WATER ISOMETRICS ALL UNITS. |
| | AIR CHAMBERS ARE NOT APPROVED. DELETE |
| | FROM RISERS. 604.9 - WATER HAMMER ARREST |
| | ORS ARE REQUIRED AT THE WASH MACHINES, |
| | DISHWASHERS, AND ICE MAKERS, AND SHALL |
| | BE LOCATED NEAR THE FIXTURES IN AN |
| | "EFFECTIVE RANGE" NOT IN THE CEILING PER |
| | PDI-WH 201 AND MANUF. INSTALLATION IN- |
| | STRUCTIONS. |
| | 15) SHT P-9 WATER PIPING DRISTRIBUTION |
| | ISOMETRIC, ICE MACHINE RISER. WATER |
| | HAMMER ARRESTORS ARE REQUIRED AT EACH |
| | WASH MACHINE PER 604.9. WATER HAMMER |
| | ARRESTORS SHALL BE LOCATED NEAR THE FIX- |
| | TURE IN AN "EFFECTIVE RANGE" NOT IN THE |
| | CEILING. PDI-WH 201 AND MANUF. INSTALL. |
| | INSTRUCTIONS. |
| | 16) P-10 STORM WATER RISER DIAGRAM, THE |
| | HORIZONTAL PIPE SIZE IS NOT CORRECT |
| | WHERE 4"SD (2060 SF) & 4"SD (2160 SF) |
| | MAXIMUM 1600 SF FOR 4" PIPE @ 1/8" PER |
| | FOOT. SIZE ALL HORIZONTAL PIPE SECTIONS. |
| | 17) SHT P-12 ALL PUMPS SHALL BE LISTED |
| | BY AN APPROVED TESTING AGENCY. SUBMIT |
| | MANUF. SPECS SHEETS. 303.4 |
| | 18) SEPARATE GAS PERMIT REQUIRED. THE |
| | FOLLOWING INFORMATION REQUIRED: |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES. |
| | C. TYPE OF GAS, (LP OR NATURAL) |
| | D. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.5.2 AND TABLES 402(1) THRU |
| | 402(34). |
| | E. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | F. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | SHOW VENTING IF DIRECT VENT. |
| | H. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | I. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |