| Date |
Text |
| 2004-01-06 00:00:00 | ************** UNSAT ***************** |
| | |
| | 1)NOTE: PLEASE LIST AND SHOW ALL MIN |
| | CIRCUITING REQ'D ON PANEL SCHEDULE FOR |
| | NEW WORK. 210.12/ 210.11C3, |
| | |
| | 2)NOTE: PLEASE CLARIFY IF BATH ROOM |
| | DOORS ARE MISSING FROM BEDROOM #2 AND |
| | FROM MASTER BEDROOM? |
| | |
| | 3)NOTE: PLEASE SEE FBC CHAPTER 34, FOR |
| | ADDTIONS TO EXISTING BLDGS. PLEASE |
| | SHOW EXISTING ELECTRICAL THAT MEETS |
| | CODE OR THAT WILL BE REQ'D TO BE BROUGHT |
| | UP TO CODE. |
| | |
| | 4)NOTE: PLEASE SEE NOTE ON RISER DIAGRAM |
| | , MENTIONS,,,IF BRKR DOES NOT FIT, |
| | PROVIDE DOUBLE LUG METER. PLEASE SEE |
| | 230.72 FOR GROUPING OF MAINS ETC. |
| | PLEASE ALSO VERIFY THIS INFOMATION AT |
| | THIS TIME AND HAVE RISER DIAGRAM |
| | REFLECT CODE COMPLIANCE AND WHICH PATH |
| | WILL BE TAKEN. |
| | PLEASE ALSO SEE THAT RISER DIAGRAM SHOWS |
| | FPL SEC'S GOING INTO MAIN PANEL AND |
| | THEN OUT TO METER AND BACK TO MAIN |
| | PANEL. PLEASE SEE NEC. LINE AND LOAD IN |
| | PANEL IS NOT PERMITTED. |
| | |
| | 5)NOTE: PLEASE SHOW LOCATION OF NEW |
| | PANEL. |
| | |
| | 6)NOTE: PLEASE ALSO SHOW LOCATION OF |
| | NEW AHU. PANEL SCHEDUL SHOWS NEW CU, BUT |
| | NOT AHU???? |
| | |
| | 7)NOTE: PLEASE CORRELATE RISER DIAGRAM |
| | AND PANELS. 100A PANEL IS SHOWN AS MLO, |
| | AND PANEL SHOWS 100A MCB. |
| | |
| | 8)NOTE: PLEASE SEE LOAD CALCULATIONS, |
| | SHOWS , SHOWS ADDITION BEING 1070 SQ FT |
| | AND YET TOTAL ON LOAD CALCS SHOWS SQ FT |
| | AT 1100 TOTAL?????? |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION AND |
| | PLEASE CORRELATE TO 2002 NEC. IF THERE |
| | ARE ANY QUESTIONS, PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |