| 2003-12-30 00:00:00 | ****CORRECTIONS***** |
| | |
| | SAMANTHA HILL, BUILDING PLANS EXAMINER |
| | [email protected] |
| | |
| | 1.)A SEPARATE PERMIT IS REQUIRED FOR |
| | THE REPLACEMENT OF THE AWNING FABRIC. |
| | |
| | 2.)A HANDRAIL IS REQUIRED ON BOTH |
| | SIDES OF THE RAMP, FBC11-4.8.5.THE |
| | CLEAR SPACE BETWEEN THE HANDRAIL AND THE |
| | WALL SHALL BE 1 1/2".TOP OF HANDRAIL |
| | GRIPPING SURFACES SHALL BE MOUNTED |
| | BETWEEN 34-38" (PLAN SHOWS 44"). |
| | |
| | 3.)THE DRINKING FOUNTAIN IS TO COMPLY |
| | WITH FBC11-4.1.3(10). |
| | |
| | 4.)PROVIDE A STRUCTURAL DETAIL FOR THE |
| | SUSPENDED CEILINGS. |
| | |
| | 5.)PROVIDE MORE INFORMATION ABOUT |
| | THE GLAZING (REPLACING STOREFRONT GLASS |
| | WITH CLEAR).DESCRIBE EXISTING AND |
| | PROPOSED, ADDRESSING IMPACT PROTECTION |
| | AND DESIGN PRESSURES. |
| | |
| | 6.)NOTE HOW THE RAMP AND RAISED AREA |
| | WILL BE CONSTRUCTED. |
| | |
| | 7.)PROVIDE A WALL SECTION FOR THE |
| | INTERIOR PARTITION WALLS. |
| | |
| | 8.)THE DOOR SHOWN AT THE OFFICE |
| | BLOCKS THE EGRESS, FBC1012.1.4. |
| | |
| | 9.)THE PERMIT APPLICATION STATES |
| | "FRAMING ONLY"; THE PLANS INCLUDE |
| | OTHER TRADES. |
| | |
| | 10.)INDICATE THE BATHROOM AND MOP |
| | SINK AS EITHER NEW OR EXISTING.IT IS |
| | NOT CLEAR ON THE PLAN. |
| | |
| | 11.)NOTE - THIS IS A PARTIAL REVIEW, |
| | AS PER CONTRACTOR'S REQUEST 1/5/04. |
| | PLANS ARE INCOMPLETE; WILL PERFORM A |
| | COMPLETE REVIEW WHEN PLANS CONTAIN |
| | SUFFICIENT INFORMATION. |