| Date |
Text |
| 2003-12-23 00:00:00 | UNSAT |
| | ~~~~~ |
| | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| | PLEASE PROVIDE THE FOLLOWING |
| | INFORMATION MAKE NECESSARY CORRECTIONS |
| | TO THE DRAWINGS AND RESUBMIT FOR REVIEW. |
| | |
| | 1} PLEASE SUBMIT AIC RATINGS FOR |
| | ALL NEW EQUIPMENT BEING INSTALLED. |
| | MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| | THE AVAILABLE FAULT CURRENT PER 110.9. |
| | |
| | 2} THE EQUIPMENT GROUND BEING RAN FROM |
| | THE METER TO THE DISCONNECT CREATES A |
| | PARALLEL FAULT RETURN PATH WITH THE |
| | NEUTRAL AND MUST NOT BE INSTALLED PER |
| | 250.6(B). |
| | |
| | 3} PLEASE PROVIDE A LOAD CALCULATION PER |
| | 220 SECTION 2 OR 220.30 SO TO SHOW |
| | COMPLIANCE WITH THE CORRECT VA RATINGS |
| | REQUIRED BY THIS ARTICLE. |
| | |
| | 4} NOTE THAT THE WATER HEATER IS SHOWN |
| | ON THE PANEL SCHEDULE AS DRAWING 19 |
| | AMPS, PLEASE CLARIFY. |
| | |
| | 5} NOTE #9 CALLS FOR ALL CONDUCTORS TO |
| | BE #12,ALL THE WIRE LISTED ON PANEL "B" |
| | IS #14,PLEASE CORRELATE. |
| | |
| | 6} PLEASE SHOW THE LOCATION OF THE |
| | SERVICE EQUIPMENT(METER & MAIN |
| | DISCONNECT). |
| | |
| | 7} PLEASE LIST THE REQ`D BATH(S) |
| | CIRCUIT(S). PER 210.11-C-3 |
| | MUST BE 20A AND #12AWG,INCLUDING THE |
| | POOL BATH AND POWDER ROOM. |
| | |
| | 8} THE LOCATION OF THE RECEPTACLE IN THE |
| | MASTER BATH DOES NOT COMPLY WITH |
| | 210.52(D)-3'. |
| | |
| | 9} 210.12 REGARDING BEDROOM OUTLETS ALSO |
| | APPLIES TO SMOKE DETECTORS AND |
| | LIGHTS/FANS,PLEASE MAKE THE APPROPRIATE |
| | NOTES TO PLANS. |
| | |
| | 10} PLEASE NOTE FRONT AND REAR |
| | RECEPTS REQ'D PER 210.52E |
| | |
| | 11} PLEASE NOTE KITCHEN COUNTER- |
| | SPACE RECEPT SPACING SHALL MEET ART; |
| | 210.52C 1,2,3,4,AND 5. |
| | |
| | 12} BEDROOM #3 IS MISSING A RECEPTACLE |
| | NEEDED TO COMPLY WITH 210.52(A)(1). |
| | |
| | IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLAN REVIEW |
| | 561/805-6718. |