| Date |
Text |
| 2004-09-20 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 CHAPTER 1 |
| | |
| | 1) SHT AP/P14.01 NO CHANGES NOTED ON THE |
| | WATER RISER DIAGRAMS IN UNITS B1 & C1. |
| | PLEASE CLARIFY. SECTION 104.2.1 |
| | 2) SHT AP/P14.02 CLEANOUT ARE REQUIRED |
| | MAXIMUM 100' IN BUILDING DRAIN. THESE |
| | HAVE BEEN DELETED ON THE LAYOUT, BUT ARE |
| | STILL ON THE BLDG. DRAIN ISOMETRIC. THE |
| | CLEANOUTS ON THE STACKS CAN NOT BE USED |
| | AS BLDG. DRAIN CLEANOUTS AS THEY ARE IN |
| | THE APARTMENTS AND ARE NOT ACCESSIBLE. |
| | SECTION 708.3.1 |
| | 3) SHT AP/P14.02 SANITARY PIPING MISSING |
| | TO BATHROOM IN UNIT C1. - FITTINGS DIS- |
| | CHARGING INTO THE BLDG. DRAIN ARE CONN- |
| | ECTING IN THE WRONG DIRECTION AGAINST |
| | THE FLOW. SECTIONS 706.3 & 104.2.1 |
| | 4) SHT AP/P14.04 NO CHANGES NOTED ON THE |
| | SAFETY PAN PIPING DIAGRAM. PLEASE CLARI- |
| | FY. SECTION 104.2.1 |
| | 5) SHT CH/P14.02 DOMESTIC WATER RISER, |
| | WATER HAMMER ARRESTORS SHALL BE LOCATED |
| | IN AN "EFFECTIVE RANGE" NEAR THE FIXTUR- |
| | ES, NOT IN THE CEILING AS SHOWN. PDI-WH |
| | 201 AND MANUF. INSTALLATION INSTRUCTIONS |
| | SEE PROVISO ON STAMPED SET OF PLANS. |
| | SECTION 104.2.1 |
| | 6) SHT CH/P14.03 THERMAL EXPANSION CONT- |
| | ROL REQUIRED. THIS HAS BEEN DELETED AND |
| | IS REQUIRED PER SECTION 607.3.2 |
| | 7) REVISIONS ARE REQUIRED TO BE SUBMITT- |
| | ED UNDER EACH PERMIT NUMBER FOR EACH OF |
| | THE BUILDINGS. WHEN RESUBMITTING REVIS- |
| | IONS, CLUBHOUSE REVISIONS ONLY SHALL BE |
| | SUBMITTED UNDER THE CLUBHOUSE PERMIT |
| | NUMBER. THEN EACH BUILDING REVISION |
| | SHALL BE SUBMITTED SEPARATELY. SECTION |
| | 1094.2.1.3. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |