| Date |
Text |
| 2004-02-28 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | FLORIDA ADMIN. CODE |
| | FLORIDA STATUTES |
| | |
| | COMMENTS NOT ADDRESSED FROM FIRST REVIEW |
| | NUMBERS TO REMAIN THE SAME FOR CLAIRITY. |
| | 3) CONTACT RODNEY COMPO, ENVIRONMENTAL |
| | COMPLIANCE FOR SIZING OF GREASE INTER- |
| | CEPTOR. WASTE ORD #2938-96 (561) 837- |
| | 4074. NEED COPY OF APPROVAL SHEET REC'D |
| | FROM R. COMPO. |
| | 4) SHT 3 OF 4 FLOOR SINK STILL REQUIRED |
| | FOR ITEM #10. CHANGE WAS MADE TO MOP |
| | SINK NOT SLOP SINK (#10). |
| | 5) SHT 3 OF 4 GREASE RISER DIAGRAM, A |
| | VENT IS REQUIRED FOR THE MOP SINK, SECT- |
| | ION 901.2.1 - VENT CAN NOT COME OUT OF |
| | DRAIN AS SHOWN. SEE RED LINE CORRECTION |
| | FOR PROPER VENTING. |
| | 6) FIRM LICENSE NUMBER REQUIRED PER FAC |
| | 61G1-16.004(2) & FS 481.219 (SEE SHEETS |
| | 1 OF 4 & 2 OF 4 - PINE TREE DESIGN) - |
| | CERTIFICATE OF AUTHORIZATION NUMBERS ARE |
| | REQUIRED FOR ALL FICTICIOUS BUSINESSES. |
| | 7) THE FOLLOWING INFORMATION IS REQUIRED |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. (SECTION OF PIPE BETWEEN |
| | THE RISE TO #7 STEAM TABLE AND #2 FIRST |
| | FRYER HAS NO LENGTH SHOWN) - SUBMIT A |
| | NEW SHEET WITH NEW RISER ON PLAN AND NOT |
| | TAPED ON EXISTING SHEET. |
| | C. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | E. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 - THE |
| | MANUF. SHEET FOR THE RICE COOKER AND THE |
| | WATER HEATER HAVE NOT BEEN SUBMITTED. |
| | THE MANUF. SHEETS FOR THE STEAM TABLE, |
| | THE SALAMANDER, & DEEP FRYERS DO NOT |
| | SHOW THE BTU'S/HR REQUIRED TO VERIFY |
| | PIPE SIZE. |
| | F. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. - A |
| | SITE PLAN FOR THIS SPACE IS REQUIRED TO |
| | SHOW LOCATION AS REQUIRED. - MORE INFOR- |
| | MATION THAN SUBMITTED IS REQUIRED. |
| | G. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58.IF NEAR THE |
| | PARKING AREA OR ROAD WAY PROTECTION OF |
| | THE TANKS IS REQUIRED. SUBMIT DETAILS. |
| | H. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. - NO UNION |
| | IS SHOWN ON RISER DIAGRAM. |
| | ********NEW COMMENT FOR GAS PERMIT****** |
| | INFORMATION FOR GAS PERMIT CAN BE SUB- |
| | MITTED AT TIME OF GAS PERMIT APPLICATION |
| | AND CAN BE OMITTED FROM THESE PLANS IF |
| | REQUESTED. - THE RISER DIAGRAM AND ALL |
| | MANUF SHEETS ECT WILL BE REQUIRED WHEN |
| | APPLYING FOR GAS PERMIT. OTHERWISE ALL |
| | INFORMATION WILL BE REQUIRED AT TIME OF |
| | RESUBMITTING PLANS. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |