| Plan Review Notes For Permit 03111280 |
| Permit Number |
03111280 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2004-02-03 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 1 | | | FBC-2001 CHAPTER 11 | | | | | | 1) ALL TOILET ROOM SHALL SHOW CLEAR | | | FLOOR SPACE PER SECTIONS 11-4.16.3, | | | 11-4.19.3, 11-4.22.3 & 11-4.24.5. | | | 2) DOORS SHALL NOT SWING INTO THE CLEAR | | | FLOOR SPACE REQUIRED FOR ANY FIXTURE. | | | 11-4.22.2 | | | 3) SHT 4 OF 7 ROOM 103 TOILET SHALL NOT | | | ENTER INTO UNOBSTRUCTED TURNING AREA FOR | | | TOILET ROOM. | | | 4) SHT 3 OF 7 SANITARY RISER DIAGRAM, | | | SHOW ALL PIPE SIZE RISER. INFORMATIONAL | | | NOTE: 5" PIPE IS NOT A COMMON PIPE SIZE. | | | UP TO 36 FIXTURE UNITS CAN BE DRAINED ON | | | 3" SANITARY PIPE. | | | 5) SHT 3 OF 7 WATER RISER DIAGRAM. WATER | | | HAMMER ARRESTORS SHALL BE INSTALLED AT | | | THE DISHWASHER AND ICE MAKER, (IF INSTA- | | | LLED), PER SECTION 604.9 LOCATED NEAR | | | THE FIXTURE IN AN "EFFECTIVE RANGE" NOT | | | IN CEILING. PDI-WH 201 AND MANUF. IN- | | | STALLATION INSTRUCTIONS. | | | 6) SHT 3 OF 7 WATER RISER DIAGRAM, WATER | | | HEATERS WILL REQUIRE THERMAL EXPANSION | | | CONTROL PER 607.3.2 AND A VACUUM RELIEF | | | VALVE PER 504.2. | | | 7) SHT 2 OF 7 ROOM 128 STAFF LOUNGE, THE | | | WATER HEATER SHALL BE ACCESSIBLE. PROVI- | | | DE DETAILS. | | | | | | REVIEW BY KEN STEVENS | | | (561) 805-6721 | | | FAX (561) 653-2692 | | | E-MAIL [email protected] |
|