| Date |
Text |
| 2003-12-09 00:00:00 | DENIED: |
| | PLEASE PROVIDE THE FOLLOWING INFORMATION |
| | FOR REVIEW: |
| | 1.OUTSIDE AIR CALCUALTIONS PER 2001 |
| | FBC(M) 403.3, FOR ALL AREAS. |
| | |
| | 2.AHU #3 NOT LOCATION NOT SHOWN ON |
| | THE PLAN (MECH RM 106?). |
| | |
| | 3.CU-5 INDICATED ON PLAN SHEET M2.1 |
| | AND IS NOT LISTED ON THE EQUIPMENT |
| | SCHEDULE ON SHEET M4.1.PLEASE CLARIFY. |
| | |
| | 4.VENTILATION FANS 6 & 7.PLEASE |
| | CLARIFY WHEN THESE FANS ARE IN OPERATION |
| | (WHILE ROLL-UP DOORS ARE CLOSED/OPEN?). |
| | WILL THE APPARATUS BAY HAVE MECHANICAL |
| | EXHAUST WHEN THE DOORS ARE CLOSED? |
| | |
| | 5.PLAN SHEET A2.3 INDICATES 2 KITCHEN |
| | SUPPLY FANS AND NO KITCHEN EXHAUST. |
| | PLEASE NOTE, 10 FT SEPARATION BETWEEN |
| | EXHAUST TERMINATION & FRESH AIR INTAKES |
| | OR HORIZONTALLY FROM PARTS FOR THE SAME |
| | OR CONTIGUOUS BUILDINGS (REFERENCE A7.2 |
| | EXHAUST FAN DETAIL). |
| | |
| | 6.ADDITIONAL PERMIT REQUIRED FOR HOOD |
| | AND FIRE SUPPRESSION.PLEASE PROVIDE |
| | THE FOLLOWING INFORMATION WITH PERMIT |
| | APPLICATION. |
| | A) PLANS INDICATING DUCT LAYOUT |
| | B) TERMINATION OF EXHAUST |
| | C) CLEARANCE TO COMBUSTIBLES PER NFPA |
| | 96 1-3.2 & 2001 FBC(M)506.3.8. |
| | D) MANUFACTURER SUBMITTAL FOR THE HOOD |
| | E) EXHAUST FAN SHALL BE A HINGED |
| | UPBLAST. (DETAIL M3.3) |
| | F) SHOW COMPLIANCE WITH NFPA 96 & |
| | FBC(M) 506. |
| | |
| | 7. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2001 FUEL GAS CODE |
| | SECS. 502 THRU 506. |
| | |
| | 8.PLAN SHEET P2.1 INDICATES FUEL OIL |
| | DAY TANK.SHEET E4.1 INDICATES THE DAY |
| | TANK IS A SUBBASE TO THE GENERATOR - |
| | PLEASE CLARIFY. |
| | |
| | 9.ADDITIONAL PERMIT REQUIRED FOR FUEL |
| | OIL. |
| | |
| | 10. PROVIDE PIPING DETAIL FOR THE |
| | CONDENSATE. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE |
| | CONTACT PATTY KRAUSS AT (561) 805-6719. |