| Date |
Text |
| 2003-11-04 00:00:00 | UNSAT |
| | ~~~~~ |
| | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| | PLEASE PROVIDE THE FOLLOWING |
| | INFORMATION,MAKE NECESSARY CHANGES TO |
| | THE PLAN AND RESUBMIT FOR REVIEW. |
| | |
| | 1} PLEASE NOTE THAT ALL PLANS |
| | THAT ARE SIGNED AND SEALED BY ARCH/ OR |
| | ENGINEER ARE REQ`D PER 61G15-23.002 FOR |
| | ENGINEER AND 61G1-16.004 FOR ARCH. |
| | SHALL HAVE A TITLE BLOCK.PLEASE SEE FAC |
| | FOR INFORMATION REQUIRED (FIRM LICENSE |
| | NUMBER). |
| | |
| | 2} PLEASE REVISE THE RISER DIAGRAM TO |
| | INCLUDE ANY EXISTING PANELS AND SUPPLY |
| | SCHEDULES OF SAME.ALL EQUIPMENT IN |
| | CALCS NOT SHOWN ON NEW PANEL. |
| | |
| | 3} NOTE THE #3 FEEDERS TO THE 200 AMP |
| | DISCONNECT ARE INCORRECT FOR THE LOAD |
| | SERVED PER 310.15(B)(6),OR 310.16.ALSO |
| | NOTE THERE IS NO NEUTRAL INDICATED,AND |
| | THE #4 GROUND TO THE FIRST MEANS OF |
| | DISCONNECT PROVIDES A PARALLEL PATH |
| | WITH THE NEUTRAL(IF THERE WAS ONE). SEE |
| | 250.6(B). |
| | |
| | 4} THE 200 AMP DISCONNECT ON THE RISER |
| | SHOWS TWO SETS OF 200 AMP FUSES,THREE |
| | PHASE? SEE COMMENT #2. |
| | |
| | 5} SHEET E.1 SHOWS A METER AND TWO |
| | DISCONNECTS,PLEASE LABEL INTENDED USE. |
| | |
| | 6} PLEASE CONFIRM THE SERVICE BEING |
| | THREE PHASE AND THAT A HIGH LEG EXISTS. |
| | |
| | IF THERE ARE ANY QUESTIONS PLEASE CALL |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLAN REVIEW |
| | 561/805-6718 |