| Date |
Text |
| 2003-10-29 00:00:00 | DENIED |
| | |
| | 1) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 2) IMPACT FEES MUST BE PAID TO PALM |
| | BEACH COUNTY, PLANS STAMPED BY THEM AND |
| | COPY OF RECEIPT SUBMITTED TO CITY OF |
| | WEST PALM BEACH BUILDING DEPARTMENT, |
| | BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| | |
| | 3)PLEASE REMOVE THE DESIGN CERTIFICATION |
| | FORM, WHICH CONTAINS INCORRECT DESIGN |
| | CRITERIA, FROM SHEET C-1. |
| | |
| | 4) FBC 1609.4 NO LONGER ALLOWS A ONE- |
| | THIRD INCREASE IN THE STEEL CALCULATIONS |
| | FOR COMBINED LOADS. PLEASE REVISE THE |
| | UPLIFT VALUES OF TRUSS CONNECTORS TO THE |
| | VALUES IN THE 2003 USP CATALOG WHICH DO |
| | NOT INCLUDE THE STRESS INCREASE. REVISE |
| | THE TRUSS CONNECTOR SCHEDULE ON A12 & |
| | A13 AND DETAILS 11 & 34 ON A11. |
| | |
| | 5) SUBMIT A CURRENT PRODUCT FOR THE |
| | STORM PANELS. THE SCHEDULE FOR THE |
| | BEGONIA MODEL INDICATES THAT THE ENTIRE |
| | DOOR AND SIDELITE OPENING IS BEING |
| | SHUTTERED. PLEASE REVISE TO SHOW THAT |
| | ONLY THE SIDELITE IS BEING SHUTTERED. |
| | PROVIDE A SCHEDULE AND KEY PLAN FOR THE |
| | DATURA MODEL (2ND FLOOR) SHOWING THAT |
| | THE SIDELITE AT THE ENTRY IS SHUTTERED. |
| | |
| | 6) SUBMIT THE SBCCI PRODUCT EVALUATION |
| | REPORT THAT CORRESPONDS WITH THE DRAWING |
| | FOR THE CLOPAY GARAGE DOOR THAT WAS |
| | SUBMITTED. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |