| Date |
Text |
| 2003-10-02 00:00:00 | 1) WET FIRE HYDRANTS ARE REQUIRED |
| | PRIOR TO, DURING AND AFTER |
| | CONSTRUCTION. |
| | |
| | 2) SUITABLE ROADS ARE TO BE PROVIDED |
| | FOR FIRE AND PARAMEDICAL EQUIPMENT |
| | DURING CONSTRUCTION. |
| | |
| | 3) PLEASE EXPLAIN HOW FIRE AND |
| | PARAMEDICAL EQUIPMENT EXPECTED TO |
| | PASS THRU THE SLIDING GATES. WHAT |
| | PROVISIONS WILL BE MADE FOR ACCESS. |
| | IF ELECTRIC WHAT HAPPENS, WHEN LOSS |
| | OF POWER OCCURS. |
| | |
| | 4) A KNOX-BOX WILL BE REQUIRED FOR |
| | ACCESS INTO THE BUILDING. |
| | |
| | 5) NO FIRE SPRINKLER PLANS PROVIDED. |
| | |
| | 6) PLEASE EXPLAIN TYPES OF STORAGE THAT |
| | WILL BE CONTAINED IN WAREHOUSE 115. |
| | ALSO PLEASE INCLUDE |
| | |
| | 7) IT APPEARS THAT ALL OF THE EMERGENCY |
| | LIGHTS ARE PRESENT ON THE OUTSIDE |
| | WALLS OF WAREHOUSE 115. WHY ARE NONE |
| | SHOWN ON FOR THE MAIN AISLE. |
| | |
| | 8) THE FIRE ALARM SYSTEM SINCE |
| | PERMITTED AFTER 8.1.03 IS REQUIRED TO |
| | BE UL LISTED FOR CENTRAL STATION |
| | SERVICE. |
| | |
| | 9) HOW IS EXITING MAINTAINED FROM |
| | WAREHOUE 115 INTO THE LOADING DOCK |
| | AREA. HOW IS THE AISLE GOING TO |
| | BE MAINTAINED. |
| | |
| | 10) PLEASE PROVIDE PRESCRIPTIVE |
| | STRENGTH REQUIREMENTS FOR MEZZANINE |
| | STAIR HANDRAILS AND GUARDRAILS. |
| | |
| | 11) PLEASE EXPLAIN ELECTRIC STRIKES AND |
| | HOW THEY EFFECT EXIT ACCESS, NEAR |
| | CORRIDOR 104 EXIT DOOR. |
| | |
| | MIKE CARSILLO, ASSISTANT FIRE MARSHAL |
| | 835-2910 |