Plan Review Notes
Plan Review Notes For Permit 03090080
Permit Number 03090080
Review Stop P
Sequence Number 1
Notes
Date Text
2003-10-01 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 1
  
 A) THE FOLLOWING INFORMATION IS REQUIRED
 FOR GAS PERMIT. (SEPARATE PERMIT REQ'D)
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE. (SEE RED LINE COMMENTS ON
 PLANS)
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 3. TYPE OF GAS, (LP OR NATURAL)
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34). THERE IS CONFLICTING INFORMAT-
 ION ON PLANS. ONE NOTE STATES 40 DRYER
 UNITS, BUT THE COUNT INDICATES 36 DRYERS
 ALSO TOTAL BTU'S INCORRECT. PLEASE
 CLAIRFY.
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3). DISTANCE TO
 MOST REMOTE ON NOTES SAYS 89 FEET BUT
 THE DROP FOR THE DRYERS IN AREA 2 ARE
 NOT ADDED. PLEASE RECALCULATE.
 6. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 TABLE 402(2) SHOWS 3,250,000 MAX FOR 3"
 PIPE. TOTAL BTU'S SEEM TO BE 3,605,000.
 EITHER 4" PIPE WILL HAVE TO BE USED OR
 A 2 LB SYSTEM CAN BE USED REDUCING MAXI-
 7. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 8. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 9. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
 10) SECTION 409.7 EACH GAS APPLIANCE
 SHALL BE PROVIDED WITH A GAS SHUTOFF
 VALVE INSTALLED UPSTREAM OF THE UNION.
 SHOW ON GAS RISER DIAGRAM.
 B) SHT 6 OF 7 WATER RISER DIAGRAM. SEC
 604.9 WATER HAMMER ARRESTORS SHALL BE
 INSTALLED FOR ALL QUICK CLOSING VALVES.
 THEY SHALL BE INSTALLED AT THE WASHMACH-
 INES AND SIZED FOR EACH RUN. ALL WATER
 HAMMER ARRESTORS SHALL BE LOCATED NEAR
 THE FIXTURES IN AN "EFFECTIVE RANGE"
 PER PDI-WH 201 AND MANUF. INSTALLATION
 INSTRUCTIONS NOT IN THE CEILING AS SH0WN
 C) SHT 6 OF 7 WATER HEATER. THERMAL
 EXPANSION PROTECTION REQUIRED PER SEC
 607.3.2
  
 REVIEW BY KEN STEVENS
 (561) 805-6721
 FAX (561) 653-2692
 E-MAIL [email protected]