| Date |
Text |
| 2003-09-25 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | FBC-2001 CHAPTER 11 |
| | FLORIDA ADMINISTRATIVE CODE |
| | W.P.B. CITY CODE |
| | |
| | 1) SHT A.5.3 DETAIL 7, SINK SHALL COMPLY |
| | WITH 11-4.24 AND ALL SUBSECTIONS. PROVI- |
| | DE DETAILS, SHOW CLEAR FLOOR SPACE, |
| | HEIGHT & CLEARANCES, FAUCETS, PIPES AND |
| | SURFACES, ECT. |
| | 2) CERTIFICATE OF AUTHORIZATION REQUIRED |
| | ON EACH SHEET. SEE ATTACHED SHEET. |
| | 61G15-23.002(2) - ALSO ENGINEER SHALL |
| | LEGIBLY INDICATE THEIR NAME AND LICENSE |
| | NUMBER ON EACH SHEET. |
| | 2) A RPZ BACKFLOW IS REQUIRED. 608.13.2. |
| | 3) SUBMIT CALCULATIONS FOR PRIMARY AND |
| | SECONDARY ROOF DRAINS PER SECTIONS 1106 |
| | & 1107 AND ALL SUBSECTIONS. (NEW ROOFS & |
| | PARAPETS) SHOW 1/2 AREA OF ALL VERTICAL |
| | WALLS AND ALL AREAS OF ROOFS THAT DRAIN |
| | ONTO THE ROOF FROM ABOVE ADDED TO CALCU- |
| | LATIONS. PROVIDE A ROOF PLAN TO SHOW |
| | LOCATIONS OF PRIMARY & SECONDARY ROOF |
| | DRAINS. SHOW SIZE OF DRAINS, AND IF |
| | SCUPPERS ARE USED PROVIDE A DETAIL SHOW- |
| | ING WIDTH AND HEIGHT OF OPENING ECT. PER |
| | SECTION 1511.6.4.3 AND SECTION 1107. |
| | 4) DRESSING ROOM BENCH TO BE FIXED TO |
| | THE WALL ALONG THE LONGER DIMENSION, 17" |
| | TO 19" ABOVE FINISHED FLOOR. SECTION |
| | 11-4.35.4 |
| | 5) THE FOLLOWING INFORMATION REQUIRED |
| | FOR GAS PERMIT. SEPARAGE GAS PERMIT REQ- |
| | UIRED. |
| | A. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | FUEL GAS CODE. |
| | B. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | FBC-2001 FUEL GAS 402.3 |
| | C. TYPE OF GAS, (LP OR NATURAL) |
| | D. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | THE FBC-2001 FUEL GAS CODE SECS. 401.8 |
| | THRU 402.5.2 AND TABLES 402(1) THRU |
| | 402(34). |
| | E. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 FUEL GAS CODE SEC. 402.2. |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | F. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | G. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | H. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | J. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | 6) GREASE INTERCEPTOR THAT IS BEING |
| | ABANDONED SHALL BE CLEANED OUT, AND RE- |
| | MOVED ENTIRELY, OR CLEANED OUT, THE TOP |
| | REMOVED, THE BOTTOM BUSTED UP AND FILLED |
| | WITH CLEAN FILL. BOTH LINES INTO AND OUT |
| | OF THE GREASE INTERCEPTOR SHALL BE CAPP- |
| | ED AND INSPECTED PRIOR TO COVERING. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |