| Date |
Text |
| 2004-01-08 00:00:00 | **************** UNSAT *************** |
| | |
| | PLEASE SEE THAT NOW A COMPLETEY NEW |
| | RISER DIAGRAM IS BEING SUBMITTED FOR |
| | REVIEW FROM ORIG. PLEASE SEE THERE IS |
| | NOW NEW COMMENTS DUE TO THIS CHANGE. |
| | |
| | 1)NOTE: PLANS NOW SHOW SERVICE COMING |
| | FROM EXSITING BLDG. THIS SERVICE APPEARS |
| | TO BE 300+ FT AWAY. PLEASE SEE SIZE OF |
| | CONDUCTORS. PLEASE PROVIDE VOLTAGR DROP |
| | CALCULATIONS. |
| | |
| | 2)NOTE: SERVICE IS NOW SHOWN FROM EXIST- |
| | -ING BLDG. PLEASE PROVIDE COMPLETE LOAD |
| | CALCULATIONS FOR EXSTING PANEL FEEDING |
| | NEW BLDG. PLEASE ALSO PROVIDE INFORMAT- |
| | -ION ON HOW EXIST IS BEING FED AND WITH |
| | WHAT SIZE OCP/SERVICE IS?? |
| | 215.5, 220. |
| | |
| | 3)NOTE: PLEASE SEE GROUNDING ELECTRODE |
| | SYSTEM FOR DETACHED BLDG'S PER 250.32 |
| | |
| | 4)NOTE: PLEASE ALSO PROVIDE COMPLETE |
| | GROUNDING FOR TRANSFORMER PER 250.30 |
| | |
| | 5)NOTE: IS SERVICE EQUIPMENT AT DETACHED |
| | BLDG ON LINESIDE OF TRANSFORMER A DISC? |
| | PANEL? PLEASE CLARIFY. |
| | |
| | 6)NOTE: PLEASE PROVIDE EQUIPMENT GROUND- |
| | ING CONDUCTORS FOR CONDUIT AT TRANSFORM- |
| | ERS. 250.110 ETC |
| | |
| | 7)NOTE: PLEASE CORRELATE RISER DIAGRAM |
| | AND PANEL SCHEDULES? SHOWN AS 125 MCB |
| | ON RISER AND PANEL SCHEDULE SHOWS 200A? |
| | PLEASE LABEL PANELS/DISCS ON RISER. |
| | LOAD CALCULATIONS ON RISER AND ON PANEL |
| | SCHEDULE DO NOT SEEM TO CORRELATE. |
| | LOAD SHOWN EXCEEDS 125A RATING OF PANEL. |
| | |
| | 8)NOTE: PLEASE SEE THAT AIC RATINGS ARE |
| | TO BE PROVIDED FOR ALL NEW EQUIPMENT. |
| | 110.9,215.5 |
| | |
| | 9)NOTE: PLEASE PROVIDE INFORMATION ON |
| | AIR EXCHANGE PER 511.3B-1 RECEPTS ARE |
| | SHOWN @ 12" AFF. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |