| 2003-09-12 00:00:00 | BUILDING CHECKLIST: |
| | 1-SURVEY: A)FLOOD ZONE A5. SHOW PROPOSED |
| | FINISH FLOOR ELEVATION. |
| | B)REVISE PROPERTY ADDRESS. THIS IS WEST |
| | PALM BEACH. NOT RIVIERA BEACH. |
| | C)PROPOSED BUILDING IS 2 STORY, NOT ONE. |
| | |
| | 2-SEE ENGINEER RECOMMENDATIONS |
| | ON PAGE 3 OF SOIL TEST REPORT: 10 MIL |
| | MINIMUM VAPOR BARRIER, ISOLATION OF |
| | GROUND FLOOR SLAB FROM COLUMN AND WALL |
| | FOUNDATIONS OR SPECIAL RECOMENDATIONS |
| | FOR MONOLITHIC FOOTING AND CHECK MIN. |
| | FOOTING SIZE FOR WIDTH AND EMBEDMENT |
| | INTO GRADE. SEC. 1804.2.2 AND SECTION |
| | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| | 3-MISSING STRUCTURAL SHEETS S-2 AND S-3. |
| | 4-ARCHITECT TO DESIGN CONTROL JOINTS IN |
| | CONCRETE SLAB OR SPECIFY SUPPORT AND |
| | SPACING FOR WWM. SEC. 1909.3 FBC 2001. |
| | 5-ENERGY CALCULATIONS: A)SECOND FLOOR IS |
| | WOOD FRAMING. REVISE WALL TYPE INSUL. |
| | ANDAREA AS REQUIRED. ADJUST CONCRETE |
| | WALL ACCORDINGLY. |
| | B)REVISE OWNER INFORMATION AND COMPLETE |
| | ALL INFORMATION ON TOP OF FORM. |
| | 6-COVER PAGE NEEDS TO BE SEALED, SIGNED |
| | AND DATED AS WELL AS REQUIRED BY |
| | CHAPTER 481 FLORIDA STATUTES. |
| | 7-SHEET A-1: A)REVISE DESIGN PARAMENTERS |
| | AND ASSUMPTIONS NOTES: THERE IS NOT |
| | SBCC, BUT FBC 2001. |
| | B)WHERE IS THE VELOCITY PRESSURE TAKEN |
| | FROM?. SEE CHAPTER 16 FBC 2001. |
| | C)WHY SHEARWALLS ARE NOT REQUIRED? |
| | **NOTE: SEE SEC. 1606.1.7 FBC 2001 FOR |
| | INFORMATION REQUIRED ON DRAWINGS. |
| | 8-SHEET A-2: A)CLARIFY IF USING STORM |
| | SHUTTERS OR MISSILE IMPACT GLAZING. |
| | IF USING NON-IMPACT GLAZING, THEN |
| | SPECIFY AREAS TO HAVE SAFETY GLAZING. |
| | SEE PLANS AND SEC. 2405.2 FBC 2001. |
| | B)NEED A COMPLETE BATHROOM ON 1ST FLOOR |
| | WITH DOOR THAT ALLOWS 29" MIN. CLEAR |
| | OPENING. SEC. 11 OF CHAPTER 11 FBC/01. |
| | **ALSO, FLOOR PLANS MISSING SPECS ON |
| | SIZES OF INTERIOR DOORS. |
| | C)OFFICE ON FIRST FLOOR FLOOR IS ALSO A |
| | BEDROOM. NEED EGRESS WINDOWS THAT |
| | COMPLY WITH SEC. 1005.4. FBC 2001. |
| | D)PROVIDE COMPLETE DETAILS/SPECS FOR |
| | HANDRAILS AND GUARDARAILS. NOTE AS PER |
| | CODE IS NOT ACCEPTABLE. NEED TO BE |
| | SPECIFIC. SEE SECTIONS 1007, 1015 AND |
| | 1608.2 FBC 2001 FOR DESIGN OPENING |
| | CLEARANCES AND STREHGTH. |
| | E)REVISE ATTIC ACCESS LOCATION. THERE IS |
| | A SECOND FLOOR ABOVE. SEE PLANS. |
| | F)WINDOW SCHEDULE: WINDOW F NEED PRODUCT |
| | APPROVAL OR COMPLETE SITE SPECIFIC |
| | ENGINEERING. |
| | G)REVISE GENERAL NOTE #10. ALL EQUIPMENT |
| | TO BE 6" MIN.ABOVE BASE FLOOD ELEVATIO |
| | |
| | 9-SHEET A-3: A)SPECIFY SAFETY GLASS |
| | WHERE REQUIRED. SEC. 2405.2 FBC 2001. |
| | SEE PLANS. |
| | B)PROVIDE COMPLETE DETAIL/SECTIONS AT |
| | MASTER LOGGIA AND BALCONIES. SEC. |
| | 104.2.1.2 CITY AMENDMENTS AND SECTIONS |
| | 1015 AND 1608.2 FBC 2001. |
| | C)REVISE NOTE #10. SEE COMMENTS ABOVE. |
| | |
| | 10-SHEET A-4: A)WINDOWS DON'T MATCH SIZE |
| | SPECIFIED ON WINDOW SCHEDULE. |
| | B)PROVIDE ENGINEERING FOR CALCULATION |
| | OF DOORS AND WINDOWS DESIGN PRESSURES. |
| | THEY DON'T MATCH TABLE 1606.2B |
| | ACCORDING TO SIZE AND LOCATION. ALSO, |
| | SEE FOOTNOTE #1. |
| | C)THERE ARE SOME DESIGN PRESSURES THAT |
| | ARE NOT SPECIFIED. EG: DOORS. |
| | D)PROVIDE COMPLETE WALL/SECTION DETAIL |
| | THRU ENTRY DOOR WALL INCLUDING |
| | PARAPET. SEC. 104.2.1.2 CITY AMENDMENT |
| | E)PROVIDE COMPLETE SECTION/DETAIL FOR |
| | CONSTRUCTION OF CANTILEVERED BAYS FOR |
| | BAYWINDOWS. SEC. 104.2.1.2 OF CITY |
| | AMENDMENTS TO FBC 2001. |
| | |
| | 11-SHEET A-6: A)STUCCO ON FRAMED WALLS |
| | TO BE 7/8" MIN. ASTM C-926. |
| | B)REVISE SPECIFICATIONS GIVEN ON 2 STORY |
| | WALL SECTION AT FIRST FIRST FLOOR. |
| | THIS IS CONC. BLOCK, NOT WOOD FRAMING. |
| | C)SPECIFY CONNECTIONS AT TOP AND BOTTOM |
| | OF SECOND FLOOR STUDS. |
| | D)SIMPSON ST22 CONNECTOR DON'T PROVIDE |
| | RESISTANCE FOR LATERAL LOADS & WHAT'S |
| | THE UPLIFT LOAD CALCULATED TO RESIST. |
| | E)GABLE ENDS ARE NOT THE ONLY ROOF ZONE |
| | 3. SEE FIGURE 1606.2(C) FBC 2001 AND |
| | REVISE ROOF SHEATHING NOTE. |
| | F)SPECIFY FIREBLOCKING ON BOTH WALL |
| | SECTIONS. AND ON STAIRS. SEE SECTION |
| | 2305 FBC 2001. ALSO, PROVIDE GENERAL |
| | SPECIFICATIONS FOR FIREBLOCKING AT ALL |
| | CONCEALED SPACES. |
| | G)REVISE FOOTING SIZES AND VAPOR BARRIER |
| | THICKNESS. SEE SOIL TEST REPORT. |
| | H)REVISE INFORMATION GIVEN ON HORIZONTAL |
| | LOAD ZONES TABLE. SEE COMMENTS ON DWG |
| | AND TABLE 1606.2A FBC 2001. |
| | I)PROVIDE COMPLETE INFORMATION ON STAIR |
| | AND HANDRAIL DETAILS. SEE SECTIONS |
| | 1007, 1015 AND 1608.2 FBC 2001. |
| | J)CLARIFY THICKNESS OF ROOF SHEATHING. |
| | 5/8" OR 3/4". SEE SHEET A-8. |
| | K)FINISH ELEVATION TO BE 4" MIN. ABOVE |
| | FINISH GRADE. SECTIONS SHOW NONE. |
| | SEC. 1804.1.7 CITY AMENDMENTS TO FBC. |
| | |
| | 12-SHEET A-7: A)UPDATE ANCHOR SCHEDULE |
| | AND ALL DETAILS THAT ARE AFFECTED BY |
| | SECTION 1609.4.3 FBC 2001 WHICH DOES |
| | NOT ALLOW THE STEEL STRESS TO BE |
| | INCREASED. IF USING SIMPSON CONNECTORS |
| | THEN, ONLY THE HIGH WIND-RESISTANT |
| | CONSTRUCTION CATALOGUE 2003 HAVE BEEN |
| | REVISED. |
| | B)GARAGE STRUCTURAL BUCK DETAIL: CLARIFY |
| | SPACING AND NUMBER OF ANCHORS. DETAIL |
| | SHOWS 9'-0" HIGH DOOR. |
| | **PLAN DETAIL SHOWS POURED CONCRETE COL. |
| | PLANS SHOW FILLED CELLS. CLARIFY. |
| | C)REVISE NOTE REFERING TO SBCCI. WE HAVE |
| | ADOPTED FBC 2001, NOT SBCCI. |
| | D)REVISE WINDOW BUCK DETAIL. SEE SECTION |
| | 1707.4.4.2 FBC 2001. |
| | E)PROVIDE STRUCTURAL BUCK DETAIL FOR |
| | EXTERIOR DOORS TOO. NOTE: SEE PRODUCT |
| | APPROVAL IF 2X OR 1X BUCK IS REQUIRED. |
| | **ALSO, SEE SEC. 1707.4.4.2 FOR PROPER |
| | BUCK ATTACHMENT. |
| | F)REVISE INSULATION VALUE GIVEN ON WALL |
| | SECTION. SEE ENERGY CALCULATIONS. |
| | |
| | 13-SHEET A-8: REVISE/CLARIFY NOTES. SEE |
| | COMMENTS ON PLAN. |
| | 14-SHEET S-1: A)MISSING FOOTINGS FOR |
| | INTERIOR BEARING WALLS. |
| | B)PROVIDE COMPLETE SECTION/DETAIL FOR |
| | CONSTRUCTION OF CANTILEVERED BAYS. |
| | C)CLARIFY FOOTING BETWEEN GARAGE AND |
| | LAUNDRY. SEE COMMENTS ON PLAN. |
| | |
| | 15-PAY IMPACT FEES. BRING BACK STAMPED |
| | DRAWINGS AND PAID RECEIPT. |
| | 16-NEED RECORDED NOTICE OF COMMENCEMENT. |
| | 17-PROVIDE SECOND FLOOR FRAMING PLAN. |
| | IT'S NOT LISTED IN THE COVER PAGE. |
| | **SHOW DRAFSTOPPING MATERIAL & LOCATION. |
| | SEE SEC. 2305.2.2 FBC 2001. |
| | 18-ROOF FRAMING PLAN TO INDICATE ROOF |
| | NAILING ZONES, NAILING TYPE & SPACING. |
| | SEE SEC. 2306 CITY AMENDMENTS TO FBC. |
| | 19-PROVIDE COMPLETE DETAIL/SPECS FOR |
| | CEILING INSTALLATION AT LOGGIAS. SEE |
| | ASTM C-926 AND ASTM C-1063 FOR |
| | STUCCO AND FASTENER SPECS. SECTION |
| | 2504.2 FBC 2001. |
| | 20-PROVIDE COMPLETE FRAMING DETAIL/SPECS |
| | FOR FRAMING AT ARCHED OPENINGS. SEC. |
| | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| | 21-PROVIDE BEAM SCHEDULE. SEC. 104.2.1.2 |
| | CITY AMENDMENTS TO FBC 2001. |
| | 22-PROVIDE PRODUCT APPROVAL FOR: |
| | A)ENTRY DOORS WITH SIDELITES AND TRANSOM |
| | ABOVE SINGLE UNIT AS SHOWN ON PLANS. |
| | B)ARCHED WINDOWS. |
| | C)OVAL WINDOWS. |
| | D)GARAGE EXTERIOR SWING DOOR. SEE PLANS. |
| | E)FRENCH DOORS WITH SIDELITES SINGLE |
| | ASSEMBLY AS SHOWN ON PLANS. |
| | F)GARAGE DOOR THAT MATCHES ONE SHOWN ON |
| | PLANS. |
| | |
| | 23-IF USING STORM SHUTTERS, THEN PROVIDE |
| | COMPLETE INFORMATION,LEGIBLE PRODUCT |
| | APPROVAL AND DRAWINGS, KEY PLAN AND |
| | INSTALLATION SCHEDULE AND MARK ON |
| | DRAWINGS THE SPECIFIC MOUNTING |
| | CONDITIONS AND ANCHOR TYPE & SPACING |
| | TO BE USED. |
| | 24-BUILDING VALUATION WAS UPDATED TO BE |
| | $327,579. ADDITIONAL FEES WILL BE |
| | ADDED TO REFLECT THIS REVISE VALUE. |
| | |
| | |
| | NOTE: |
| | PLEASE RETURN REVIEWED SET AFTER |
| | CORRECTIONS ARE DONE TO THE ORIGINAL |
| | CAD DRAWINGS TO EXPEDITE THE REVIEW |
| | PROCESS. |