| Date |
Text |
| 2003-08-29 00:00:00 | BUILDING CHECKLIST: |
| | 1-PAY IMPACT FEES. BRING BACK STAMPED |
| | DRAWINGS AND PAID RECEIPT. |
| | 2-NEED RECORDED NOTICE OF COMMENCEMENT. |
| | 3-PROVIDE COMPLETE GABLE END TRUSS |
| | DETAIL SHOWING COMPLIANCE WITH SECTION |
| | 2313.4 FBC 2001. SPECIFY STRUCTURAL |
| | CONTINUITY AT POINTS OF LATERAL |
| | SUPPORTS. SPECIFY ALL FASTENERS AND |
| | FRAMING MEMBERS. |
| | **NOTE: NEED TWO DETAILS SINCE THERE |
| | ARE TWO DIFFERENT GABLE END TYPES. |
| | SEE ELEVATIONS. |
| | 4-UPDATE TRUSS ANCHOR SCHEDULE AND ALL |
| | DETAILS THAT ARE AFFECTED BY SECTION |
| | 1609.4.3 FBC 2001, WHICH DOESN'T |
| | ALLOW THE STEEL STRESS INCREASE. |
| | SEE SIMPSON HIGH WIND-RESISTANT |
| | CONSTRUCTION CATALOGUE, WHICH IS THE |
| | ONLY SIMPSON CATALOGUE THAT'S UPDATED. |
| | **ALSO, SOME CONNECTORS SPECIFIED ON |
| | THE TRUSS ANCHOR SCHEDULE SHOW HIGHER |
| | UPLIFT VALUES THAN SHOWN ON CATALOGUE. |
| | REVISE AS REQ'D OR PROVIDE ENGINEERING |
| | CALCULATIONS FOR HIGHER VALUES. |
| | SEE NUMBER OF NAILS SPECIFIED, ETC. |
| | 5-REVISE DOORS/WINDOWS BUCK DETAILS TO |
| | COMPLY WITH SECTION 1707.4.4.2 FBC. |
| | 6-SHEET A-1: REVISE NOTE #2 FOR CONCRETE |
| | SEE SEC. 1901 FBC 2001 FOR PROPER |
| | ACI REFERENCE. |
| | **CLARIFY FOOTING FOR REAR PORCH. SEE |
| | PLAN. |
| | 7-SHEET A-2: A)GLASS BLOCK AT BUTH TUB/ |
| | SHOWER AREAS TO BE SAFETY GLASS OR |
| | TO HAVE 0.25" MIN. FACE THICKNESS. |
| | SEC. 2405.2 FBC 2001. SPECIFY WHICH |
| | ONE IS GOING TO BE. |
| | B)REVISE MINIMUM SIZE OF ATTIC ACCESS. |
| | SEE SEC. 2309.6 FBC 2001. |
| | C)WINDOW AT BEDROOM #2 DOESN'T COMPLY |
| | WITH SEC. 1005.4.3 FBC 2001. |
| | D)MASTER BEDROOM TO HAVE DOOR OPENING |
| | AT WATER CLOSET TO ALLOW 29" MINIMUM |
| | CLEAR OPENING. SEC 11 OF CHAPTER 11 |
| | FBC 2001. |
| | E)DEN ROOM DOESN'T HAVE EGRESS WINDOWS. |
| | PROVIDE EGRESS WINDOW OR VISIBLE WRITE |
| | UNDER THE DEN WORD: "THIS ROOM IS NOT |
| | TO BE USED FOR SLEEPING PURPOSES |
| | BECAUSE THERE IS NOT EGRESS OPENING" |
| | |
| | 8-SHEET A/5A AND A/5B: A)REVISE ROOF |
| | ZONES KEY PLAN. GABLE END IS ON THE |
| | ROOF ZONE 3. SEE SEC. 2306 OF CITY |
| | AMENDMENTS TO FBC 2001. |
| | B)REVISE/CLARIFY DESIGN PARAMETERS. |
| | INTERNAL PRESSURE COEFFICENT SHALL BE |
| | CALCULATED FOR NEGATIVE AND POSITIVE. |
| | SEE ASCE 7-98. |
| | C)SOIL BEARING PRESSURE TO BE IN PSF, |
| | NOT PSI. |
| | D)ROOF SHEAR DIAPHRAGM SCHEDULE: NEED 8D |
| | RING SHANK NAIL AT ZONE #3. SEE SECT'N |
| | 2306 CITY AMENDMENTS TO FBC 2001. |
| | F)REVISE ATTIC SIZE. SEC. 2309.6 FBC. |
| | G)SPECIFY ALL CONNECTORS FOR SHEARWALL |
| | SEGMENTS AND CORNERS AS SPECIFIED ON |
| | SHEET A-9. |
| | |
| | 9-SHEET A-6: A)HEADER CONSTRUCTION AT |
| | ENTRY DOOR IS NOT CLEAR. SEE BUILDING |
| | SECTION A-A AND DETAIL 16/A-8. |
| | B)ATTIC VENTILATION IS FOR ENTIRE ROOF |
| | NOT FOR LIVING AREA ONLY. REVISE NOTES |
| | ON WALL SECTIONS. |
| | C)REVISE THICKNESS OF VAPOR BARRIER. SEE |
| | SEC. 1909.2 FBC 2001. REVISE NOTES ON |
| | WALL SECTIONS. |
| | D)ZERO LOT LINE WALL NEEDS ONE HOUR FIRE |
| | RATED ASSEMBLY WALL FROM FOOTING TO |
| | ROOF AND PROTECTED FROM INTERIOR AND |
| | EXTERIOR AS REQUIRED BY TABLE 600 FOOT |
| | NOTE I. NEED DETAIL/SPECS FOR FIRE |
| | RATED ASSEMBLY AT SECOND FLOOR AT |
| | TRANSITION OF CONCRETE BLOCK TO FRAMED |
| | WALL. |
| | |
| | 10-SHEET A-8: A)DETAIL 2/A-8: UPDATE |
| | SEMCO CONNECTOR. |
| | **NEED 7/8" MIN. STUCCO. ASTM C-926. |
| | **SPECIFY STUD CONNECTOR TO GIRDER TRUSS |
| | **SAME COMMENTS FOR DETAIL 7/A-8. |
| | B)STAIR DETAILS: DETAIL 12/A-8 & 13/A-8 |
| | DON'T MATCH. |
| | **RISER AND TREAD ON DETAIL 12/A-8 DON'T |
| | MATCH FLOOR PLANS. |
| | **REVISE SPACING OF HANDRAIL PICKETS. |
| | **SPECIFY FIREBLOCKING AS REQ'D BY SEC. |
| | 2305 AT STAIRS. |
| | C)SPECIFY SIZE OF WASHER FOR GARAGE |
| | DOOR STRUCTURAL BUCK DETAIL. |
| | D)DETAIL 4/A-8: CLARIFY SIZE OF STUDS. |
| | SEE FRAMING PLANS. REVISE FASTENERS |
| | ACCORDINGLY. |
| | E)DETAIL 15/A-8: SEE COMMENTS ON SHEET. |
| | |
| | 11-SHEET A-9: SHEAR WALL SCHEDULE NEED |
| | ALL INFORMATION. NAILING SIZE, SPACING |
| | ETC. SEE COMMENTS ON SHEET. |
| | **UPDATE SEMCO CONNECTORS. |
| | **WHERE ARE THE SHEARWALL NOTES?. SEE |
| | COMMENTS ON PLANS. |
| | |
| | NOTE: PLEASE RETURN REVIEWED SET AFTER |
| | CORRECTIONS ARE DONE TO THE ORIGINAL |
| | CAD DRAWINGS TO EXPEDITE THE REVIEW |
| | PROCESS AND CLOUD ALL CHANGES. |
| | |
| | 12-PROVIDE COMPLETE INFORMATION FOR |
| | STORM SHUTTERS OR APPLY FOR A SEPARATE |
| | PERMIT. |
| | 13-PROVIDE PRODUCT APPROVAL FOR FIXED |
| | WINDOWS WITH SIZE AS SHOWN ON LIVING |
| | AND DINING AREA. SEE PLANS. |
| | 14-OWES $285.67 FOR UPDATED VALUATION |
| | AND RADON FEES. |
| | 15-PROVIDE ATTIC ACCESS AT GARAGE. SEC. |
| | 2309.6 FBC 2001. |
| | 16-PROVIDE GENERAL SPECIFICATIONS FOR |
| | FIREBLOCKING AT ALL CONCEALED SPACES |
| | AS REQUIRED BY SEC. 2305 FBC 2001. |
| | 17-RESUBMIT PRODUCT APPROVAL FOR ENTRY |
| | DOORS: NEED UPDATED PRODUCT APPROVAL |
| | WITH DADE COUNTY LOGO AT BOTTOM OF |
| | REPORT PAGE AND DRAWINGS WITH THE |
| | RENEWAL STAMP. |
| | 18-PROVIDE DETAIL SPECS FOR 1 HOUR FIRE |
| | RATED GLASS BLOCK ASSEMBLY (ARCHITECT) |
| | **PROVIDE PRODUCT APPROVAL FOR ONE HOUR |
| | GLASS BLOCK ASSEMBLY (CONTRACTOR). |