| Date |
Text |
| 2003-11-08 00:00:00 | *****CORRECTIONS***** |
| | |
| | SAMANTHA THYNG, BUILDING PLANS EXAMINER |
| | 561-805-6724 |
| | |
| | 1.)SEPARATE PERMITS REQUIRED. |
| | |
| | 2.)A NOTICE OF COMMENCEMENT MUST BE |
| | FILED WITH THE CLERK OF COURTS BEFORE A |
| | PERMIT CAN BE ISSUED.A NOTICE OF |
| | COMMENCEMENT IS IN THE PACKAGE BUT IT IS |
| | INCOMPLETE.IT MUST BE COMPLETED AND |
| | FILED WITH THE CLERK OF COURTS. |
| | |
| | 3.)SEE PREVIOUS LIST, ITEM #3, AND |
| | FIRST CORRECTION LIST, ITEM #3.AS |
| | DISCUSSED WITH YOU ON THE TELEPHONE, A |
| | 34 SINGLE HUNG WINDOW DOES NOT MEET |
| | EMERGENCY EGRESS REQUIREMENTS.A COPY |
| | OF STANDARD WINDOW SIZES WAS ATTACHED TO |
| | THE PREVIOUS LIST (IT IS STILL IN THE |
| | PACKAGE) AND I FAXED ONE TO YOU AFTER |
| | OUR TELEPHONE CONVERSATION.YOU HAVE |
| | CHANGED THE NOTE TO SAY "EH"; UNSURE AS |
| | TO WHAT THAT IS.IF YOU FEEL THAT I AM |
| | IN ERROR, PROVIDE THE MANUFACTURER'S |
| | SPECIFICATION SHOWING THAT A 34 SINGLE |
| | HUNG MEETS THE EMERGENCY REQUIREMENTS |
| | PER FBC1005.4. |
| | |
| | 4.)SEE THE PREVIOUS LIST, ITEM 5. |
| | A NOTE WAS MADE THAT A WINDOW IN THE |
| | MASTER BATH NEEDS TO COMPLY WITH |
| | FBC2405.1.THE CORRECTION WAS MADE |
| | REFERENCING BATH 2, THE WINDOW AT THE |
| | SHOWER.WHEN REVISING THE PLAN, DO NOT |
| | QUOTE CODE SECTION. THE PRODUCT APPROVAL |
| | SUBMITTED IS FOR IMPACT WINDOWS; THE |
| | PLAN CAN INDICATE EITHER SAFETY GLASS, |
| | TEMPERED, OR IMPACT, BUT DO NOT |
| | REFERENCE CODE SECTION ONLY FBC104.2. |
| | |
| | 5.)SEE PREVIOUS LIST, ITEM #6.A |
| | NOTE WAS ADDED IN REGARDS TO THE LIVE |
| | LOAD FOR THE BOTTOM CHORD, BUT #11 OF |
| | THE ROOF PLAN NOTES STILL SHOWS THE LIVE |
| | LOAD, BOTTOM CHORD AS 5PSF.THIS SHOULD |
| | BE 30 FOR ATTICS WITH STORAGE, 10 FOR |
| | ATTICS WITHOUT STORAGE. |
| | |
| | 6.)THE HURRICANE SHUTTER INSTALLATION |
| | SCHEDULE IS A FORM TO BE FILLED OUT.A |
| | COPY WAS PROVIDED WITH THE LAST REVIEW. |
| | A NOTE ON THE PLAN IS NOT NECESSARY, BUT |
| | THE FORM DOES NEED TO BE COMPLETED. |
| | |
| | 7.)PLEASE DO NOT DISSASEMBLE THE |
| | PACKAGES I HAVE PUT TOGETHER.THEY HAVE |
| | BEEN PUT TOGETHER TO PREPARE THE PACKAGE |
| | FOR ISSUANCE; TAKING THE PACKAGES APART |
| | DELAYS THE PERMIT PROCESS. |
| | |
| | 8.)THE SOILS REPORT RECOMMENDS A |
| | CONTINUOUS FOUNDATION WIDTH OF AT LEAST |
| | 18".REVISE THE FOUNDATION PLAN. |
| | |
| | 10.)SEE PREVIOUS CORRECTION LIST, ITEM |
| | #8.THE PRODUCT APPROVAL SUBMITTED FOR |
| | DOORS WAS FOR AN IMPACT FRENCH DOOR WITH |
| | SIDELITES.THE FRONT DOOR IS A SERIES |
| | OF THREE FRENCH DOORS.THIS IS NOT |
| | COVERED BY THE PRODUCT APPROVAL |
| | SUBMITTED.THE MULLION PRODUCT APPROVAL |
| | SUBMITTED HAS A MAX DESIGN LOAD OF |
| | +-35 FOR THAT SIZE.PLEASE NOTE THAT |
| | A HEAVY DUTY MULLION HAS A HIGHER DESIGN |
| | LOAD.SUBMIT PRODUCT APPROVALS FOR THE |
| | MULLION FOR THE FRONT DOOR AND THE |
| | FRENCH DOORS (WITHOUT SIDELITES). |
| | |
| | 11.)THE FRONT DOOR (MAIN EGRESS) IS |
| | REQUIED TO HAVE A MINIMUM CLEARANCE OF |
| | 32", FBC1012.1.1. |
| | |
| | WHEN RESUBMITTING, REPLACE SHEETS WHICH |
| | HAVE BEEN REVISED AND SUBMIT OLD SHEETS |
| | SEPARATELY. |