Plan Review Notes For Permit 03061612
Permit Number 03061612
Review Stop B
Sequence Number 3
Notes
Date Text
2003-11-08 00:00:00*****CORRECTIONS*****
  
 SAMANTHA THYNG, BUILDING PLANS EXAMINER
 561-805-6724
  
 1.)SEPARATE PERMITS REQUIRED.
  
 2.)A NOTICE OF COMMENCEMENT MUST BE
 FILED WITH THE CLERK OF COURTS BEFORE A
 PERMIT CAN BE ISSUED.A NOTICE OF
 COMMENCEMENT IS IN THE PACKAGE BUT IT IS
 INCOMPLETE.IT MUST BE COMPLETED AND
 FILED WITH THE CLERK OF COURTS.
  
 3.)SEE PREVIOUS LIST, ITEM #3, AND
 FIRST CORRECTION LIST, ITEM #3.AS
 DISCUSSED WITH YOU ON THE TELEPHONE, A
 34 SINGLE HUNG WINDOW DOES NOT MEET
 EMERGENCY EGRESS REQUIREMENTS.A COPY
 OF STANDARD WINDOW SIZES WAS ATTACHED TO
 THE PREVIOUS LIST (IT IS STILL IN THE
 PACKAGE) AND I FAXED ONE TO YOU AFTER
 OUR TELEPHONE CONVERSATION.YOU HAVE
 CHANGED THE NOTE TO SAY "EH"; UNSURE AS
 TO WHAT THAT IS.IF YOU FEEL THAT I AM
 IN ERROR, PROVIDE THE MANUFACTURER'S
 SPECIFICATION SHOWING THAT A 34 SINGLE
 HUNG MEETS THE EMERGENCY REQUIREMENTS
 PER FBC1005.4.
  
 4.)SEE THE PREVIOUS LIST, ITEM 5.
 A NOTE WAS MADE THAT A WINDOW IN THE
 MASTER BATH NEEDS TO COMPLY WITH
 FBC2405.1.THE CORRECTION WAS MADE
 REFERENCING BATH 2, THE WINDOW AT THE
 SHOWER.WHEN REVISING THE PLAN, DO NOT
 QUOTE CODE SECTION. THE PRODUCT APPROVAL
 SUBMITTED IS FOR IMPACT WINDOWS; THE
 PLAN CAN INDICATE EITHER SAFETY GLASS,
 TEMPERED, OR IMPACT, BUT DO NOT
 REFERENCE CODE SECTION ONLY FBC104.2.
  
 5.)SEE PREVIOUS LIST, ITEM #6.A
 NOTE WAS ADDED IN REGARDS TO THE LIVE
 LOAD FOR THE BOTTOM CHORD, BUT #11 OF
 THE ROOF PLAN NOTES STILL SHOWS THE LIVE
 LOAD, BOTTOM CHORD AS 5PSF.THIS SHOULD
 BE 30 FOR ATTICS WITH STORAGE, 10 FOR
 ATTICS WITHOUT STORAGE.
  
 6.)THE HURRICANE SHUTTER INSTALLATION
 SCHEDULE IS A FORM TO BE FILLED OUT.A
 COPY WAS PROVIDED WITH THE LAST REVIEW.
 A NOTE ON THE PLAN IS NOT NECESSARY, BUT
 THE FORM DOES NEED TO BE COMPLETED.
  
 7.)PLEASE DO NOT DISSASEMBLE THE
 PACKAGES I HAVE PUT TOGETHER.THEY HAVE
 BEEN PUT TOGETHER TO PREPARE THE PACKAGE
 FOR ISSUANCE; TAKING THE PACKAGES APART
 DELAYS THE PERMIT PROCESS.
  
 8.)THE SOILS REPORT RECOMMENDS A
 CONTINUOUS FOUNDATION WIDTH OF AT LEAST
 18".REVISE THE FOUNDATION PLAN.
  
 10.)SEE PREVIOUS CORRECTION LIST, ITEM
 #8.THE PRODUCT APPROVAL SUBMITTED FOR
 DOORS WAS FOR AN IMPACT FRENCH DOOR WITH
 SIDELITES.THE FRONT DOOR IS A SERIES
 OF THREE FRENCH DOORS.THIS IS NOT
 COVERED BY THE PRODUCT APPROVAL
 SUBMITTED.THE MULLION PRODUCT APPROVAL
 SUBMITTED HAS A MAX DESIGN LOAD OF
 +-35 FOR THAT SIZE.PLEASE NOTE THAT
 A HEAVY DUTY MULLION HAS A HIGHER DESIGN
 LOAD.SUBMIT PRODUCT APPROVALS FOR THE
 MULLION FOR THE FRONT DOOR AND THE
 FRENCH DOORS (WITHOUT SIDELITES).
  
 11.)THE FRONT DOOR (MAIN EGRESS) IS
 REQUIED TO HAVE A MINIMUM CLEARANCE OF
 32", FBC1012.1.1.
  
 WHEN RESUBMITTING, REPLACE SHEETS WHICH
 HAVE BEEN REVISED AND SUBMIT OLD SHEETS
 SEPARATELY.