| Plan Review Notes For Permit 03060041 |
| Permit Number |
03060041 |
|
| Review Stop |
M |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2003-07-19 00:00:00 | PROVISO: | | | NOTES DATED 6/26/03 BY HAROLD MOSER | | | 1.HYDRONIC PIPING SYSTEMS SHALL BE | | | TESTED HYDRONICALLY AT ONE-HALF TIMES | | | THE MAXIMUM SYSTEM DESIGN PRESSURE, BUT | | | NOT LESS THAN 100 PSI.FROM RISER TO | | | A/C #1 & 2. | | | 2.HAVE PIPE DIAGRAM WITH PLANS WITH | | | PLANS. | | | 3.HAVE EQUIPMENT SPECIFICATION WITH | | | PLANS. | | | | | | NOTES FROM PATTY KRAUSS 7-19-03 | | | 1.PLAN SHEET M-1 INDICATES "PACKAGE | | | UNITS".PLEASE CLARIFY, ARE UNITS A | | | PART OF THE BUILDING A/C A CONDENSER | | | WATER SYSTEM?ARE THESE UNITS ACTUALLY | | | HEAT PUMPS? | | | 2.SHOULD UNITS BE HEAT PUMPS, INDICATE | | | LOCATION, DUCT SIZE AND MATERIAL OF | | | OUTSIDE AIR. | | | 3.PLEASE NOTE DUCT SMOKE DETECTORS TO | | | HAVE NOTIFICATION AS PER NFPA 90A - | | | 4-4.4. | | | | | | IF YOU HAVE ANY QUESTIONS, PLEASE | | | CONTACT PATTY KRAUSS AT (561) 805-6719. |
|