| 2003-06-27 00:00:00 | UNSAT |
| | ~~~~~ |
| | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| | PLEASE PROVIDE THE FOLLOWING |
| | INFORMATION,MAKE NECESSARY CHANGES TO |
| | PLAN AND RESUBMIT FOR REVIEW. |
| | |
| | 1} PLEASE SUBMIT AIC RATINGS FOR |
| | ALL NEW EQUIPMENT BEING INSTALLED. |
| | MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| | THE AVAILABLE FAULT CURRENT PER 110-9. |
| | |
| | 2} THE SERVICE IS DESIGNED @ 400 AMPS. |
| | THE GROUNDING ELECTRODE CONDUCTOR SHOULD |
| | BE 1/0 PER 250-66. |
| | |
| | 3} THE AMPERE RATINGS FOR THE A/C SYSTEM |
| | ARE DIFFERENT IN THE LOAD CALCS,THE |
| | PANEL SCHEDULE,AND ON THE MECHANICAL |
| | SHEET.PLEASE CORRELATE,ADJUST |
| | CALCULATION TO REFLECT ACTUAL |
| | CONDITIONS. |
| | |
| | 4} THE LOAD CALCULATIONS INDICATE A 200 |
| | AMP SERVICE,THERE ARE 2-200 AMP MAINS ON |
| | THE PLANS,PLEASE CLARIFY. |
| | |
| | 5} THE WATER HEATER IS SHOWN AS 6 KW IN |
| | THE CALCS AND SHOWN ON A 30 AMP BREAKER |
| | ON THE SCHEDULE,PLEASE CORRELATE. |
| | |
| | 6} THE PHASE "C" MARKING ON THE SCHEDULE |
| | SHOULD BE CHANGED TO PHASE "B". |
| | |
| | 7} PLEASE LIST THE REQ'D ARC |
| | FAULT PROTECTED CIRCUITS ON PANEL |
| | SCHEDULE PER 210-12. |
| | |
| | 8} ADD A RECEPTACLE IN THE "NOOK" |
| | TO COMPLY WITH 210-52(A)(1). |
| | |
| | IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLAN REVIEW |
| | 561/805-6718 |
| | E-MAIL [email protected] |