| Date |
Text |
| 2003-06-18 00:00:00 | UNSAT |
| | ~~~~~ |
| | ~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~ |
| | PLEASE PROVIDE THE FOLLOWING |
| | INFORMATION,MAKE NECESSARY CHANGES TO |
| | PLANS AND RESUBMIT FOR REVIEW. |
| | |
| | 1} PLEASE STATE THE CORRECT AMPERAGE OF |
| | THE METER ENCLOSURE ON THE RISER |
| | DIAGRAM. 500 AMPS DOES NOT CORRELATE TO |
| | ANY U L LISTED METER ENCLOSURE. |
| | |
| | 2} PLEASE SUBMIT AIC RATINGS FOR |
| | ALL NEW EQUIPMENT BEING INSTALLED. |
| | MAINS/PANELS/BREAKERS MUST BE RATED FOR |
| | THE AVAILABLE FAULT CURRENT PER 110-9. |
| | |
| | 3} PLEASE INDICATE THE NUMBER AND SIZE |
| | OF THE CONDUCTORS IN THE 8"X8" GUTTER. |
| | |
| | 4} THE #4 JUMPER SHOWN IN THE GUTTER |
| | FORMS A PARALLEL GROUND PATH WITH THE |
| | NEUTRAL THAT IS APPARANTLY TO BE |
| | GROUNDED AT THAT POINT,AND MUST BE |
| | REMOVED. |
| | |
| | 5} THE #2 GROUNDING ELECTRODE CONDUCTOR |
| | IS NOT SUFFICIENTLY SIZED FOR THE |
| | SERVICE,SEE 250-66. |
| | |
| | 6} THE 1/0 CONDUCTORS ARE INCORRECT FOR |
| | 250 AMP OVERCURRENT SHOWN FROM THE |
| | DISCONNECT TO THE PANEL"A".310-15(B)(6). |
| | |
| | 7} PLEASE LIST THE REQ'D ARC |
| | FAULT PROTECTED CIRCUITS ON PANEL |
| | SCHEDULE OR NOTE ON PLANS FOR BRANCH |
| | CIRCUIT PROTECTION. PER 210-12. |
| | |
| | 8} PLEASE LIST THE REQ'D BATH(S) |
| | CIRCUIT(S). PER 210-11-C-3 |
| | MUST BE 20A AND #12AWG. |
| | |
| | 9} A GFI MUST BE ADDED TO THE FRONT TO |
| | COMPLY WITH 210-52(E) |
| | |
| | 10} THERE ARE TWO PANELS SHOWN ON THE |
| | RISER DIAGRAM AND ONLY ONE SHOWN ON THE |
| | PLAN.PLEASE SHOW ALL EQUIPMENT. |
| | |
| | 11} ALL BATH RECEPTACLES MUST COMPLY |
| | WITH 210-52(D).SEE MASTER BATH. |
| | |
| | IF THERE ARE ANY QUESTIONS PLEASE CALL. |
| | |
| | BILL TROBAUGH |
| | ELECTRICAL PLAN REVIEW |
| | 561/805-6718 |