| Plan Review Notes For Permit 03051238 |
| Permit Number |
03051238 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2003-05-28 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | FHA-98 DESIGN MANUAL | | | | | | 1) SHT AU-4 DETAIL 3/ADT-4, BACKING FOR | | | TUB & W/C TO COMPLY WITH FHA DESIGN MAN- | | | UAL. SEE PAGE 6.9 - HEIGHT, LENGTH & | | | WIDTH TO BE THE SAME AS SHOWN. | | | 2) SHTS PT1.3, PT1A.3, PT2.3, & PT2A.3, | | | FULL OPEN VALVES REQUIRED AT THE BASE OF | | | EVERY WATER RISER. SECTION 606.1(3) | | | 3) SHT PD-1 PLUMBING GENERAL NOTES: | | | #2 PVC NOT APPROVED FOR DISTRIBUTION | | | PIPE. SEE TABLE 605.5 | | | #6 DIELECTRIC UNIONS APPROVED FOR GAS | | | PIPING ONLY. PLEASE DELETE REFERENCE. | | | 4) SHT PD-1 WATER HEATER DETAIL - NOTE | | | CONCERNING AIR CHAMBERS. AIR CHAMBERS | | | ARE NOT APPROVED. PLEASE DELETE REFEREN- | | | CE. - THERMAL EXPANSION CONTROL REQUIRED | | | PLEASE SHOW ON DETAIL. SECTION 607.3.2 | | | 5) SHT PM-2 INSTANTANEOUT WATER HEATERS, | | | MANUF. INFO. REQUIRED. W/HEATERS SHALL | | | BE LISTED WITH AN APPROVED TESTING | | | AGENCY. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 | | | (561) 805-6721 | | | FAX (561) 653-2692 |
|