| Plan Review Notes For Permit 03050246 |
| Permit Number |
03050246 |
|
| Review Stop |
ENG |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2003-05-06 00:00:00 | FAILED : | | | 1. PLEASE PROVIDE STORM WATER | | | CALCULATION (WATER QUALITIES) FOR OUR | | | REVIEW. | | | 2. DRIVEWAY APPROACHES MUST BE | | | CONSTRUCTED PER CITY STANDARD, FROM CURB | | | CUT TO PROPERTY LINE SHOULD BE 6" | | | CONCRETE. | | | 2. ALL PARKING STALLS MUST PAINTED WITH | | | DOUBLE 4" STRIPES, PER CITY REQUIREMENT. | | | 3. A BACKFLOW PREVENTER IN 1" WATER | | | SERVICE IS REQUIRED. | | | 3. A CLEAN OUT WILL NEED TO BE INSTALLED | | | IN THE SANITARY SEWER LATERAL, ON THE | | | PROPERTY AT BACK OF SIDEWALK, IF NOT | | | ALREADY INSTALLED. | | | 4. 6" SEWER LATERAL SHOULD BE CONNECTED | | | TO MANHOLE? AS SHOWN DIRECTLY WITHOUT | | | USE OF 8X6 REDUCER, PLEASE VERIFY. | | | 5. POLLUTION/EROSION PLANS MUST BE ADDED | | | TO CIVIL/SITE PLAN, DETAILS, SILT FENCE, | | | NOTE TO GC, ECT.PLANS MUST BE | | | INSTALLED IN FIELD PRIOR TO ANY EARTH/ | | | CONSTRUCTION. | | | 6. PLEASE NOTE THAT A SEPARATE PERMIT | | | APPLICATION AND FEES FOR UNDERGROUND | | | UTILITIES AND SITE WORK IS REQUIRED. | | | IF ANY QUESTION PLEASE CONTACT 805-6723 | | | MOHAMMAD R. AMINI |
|