| 2003-06-06 00:00:00 | 1) WET FIRE HYDRANTS ARE REQUIRED PRIOR |
| | TO, DURING, AND AFTER CONSTRUCTION. |
| | |
| | 2) TEMPORARY STANDPIPES ARE REQUIRED |
| | WHEN CONSTRUCTION REACHES THREE STORIES |
| | OR THIRTY FEET IN HEIGHT. |
| | |
| | 3) EXIT STAIRS ARE REQUIRED DURING |
| | CONSTRUCTION. |
| | |
| | 4) ALL CONSTRUCTION WORK IS TO COMPLY |
| | WITH NFPA 241. |
| | |
| | 5) DOOR AT STAIR # 2 SWINGS OUTWARD |
| | INSTEAD OF INWARD. |
| | |
| | 6) BOTH STAIRS ON L.S.1 ARE LABELED |
| | STAIR # 2. |
| | |
| | 7) PLEASE INDICATE ALL DEVICES AND |
| | EQUIPMENT THAT WILL BE CONTAINED |
| | IN THE FIRE COMMAND ROOM. PLEASE SEE |
| | FBC 412.4.1. |
| | |
| | 8) PLEASE PROVIDE MORE DETAILS ON |
| | SECRUITY LOCKS PLANNED FOR EXIT |
| | DOORS. |
| | |
| | 9) ALL STAIRS AND RAMPS ARE REQUIRED |
| | TO HAVE HANDRAILS ON BOTH SIDES. |
| | |
| | 10) STAIR # 2 AT GROUND LEVEL SWINGS |
| | INWARD INSTEAD OF OUTWARD. |
| | |
| | 11) PLEASE PROVIDE PRESCRIPTIVE STRENGTH |
| | REQUIREMENTS FOR ALUMINUM AND RAILINGS. |
| | |
| | 12) LOCATION MAY BE LOCATED IN THE |
| | CITY FIRE LIMITS. CERTAIN RESTRICTIONS |
| | MAY APPLY. |
| | |
| | 13) BUILDING ADDRESS REQUIRED ON PROPER |
| | ELEVATION. |
| | |
| | 14) A TWO HOUR FIRE SEPARATION IS |
| | REQUIRED BETWEEN THE PARKING GARAGE |
| | AND THE BUILDING. |
| | |
| | 15) PROVIDE INFORMATION ON INSULATION |
| | PLANNED FOR THE TRASH CHUTE. |
| | |
| | 16) WHY ARE STAIR # 2 AND STAIR # 3 |
| | POSITIONED SO CLOSE TOGETHER. |
| | |
| | 17) INDICATE TYPE OF CONSTRUCTION. |
| | |
| | 18) INDICATE CODE DATA. |
| | |
| | 19) VICINITY SPELLED WRONG ON PLANS. |
| | |
| | 20) WHY IS THE FIRE PUMP ROOM LOCATED |
| | ON PARKING LEVEL B-2. |
| | |
| | 21) NO EMERGENCY LIGHT NOTED IN FIRE |
| | PUMP ROOM. |
| | |
| | 22) ELECTRICAL CONDUITS NOTED IN STAIR |
| | # 2. THE STAIR CANNOT BE USED AS A CHASE |
| | FOR EQUIPMENT. |
| | |
| | 23) WHY IS THERE NO EXIT SIGN NEAR |
| | EXTERIOR DOORS NEAR THE MAIL ROOM. |
| | |
| | 24) SMOKE DETECTOR MISSING FROM BEDROOM |
| | UNIT B-4. |
| | |
| | 25) SMOKE DETECTOR MISSING FROM BEDROOM |
| | UNIT B-3. |
| | |
| | 26) FOUR FDC'S SHOWN. THIS OFFICE ONLY |
| | REQUIRES TWO OF THEM. |
| | |
| | 27) FSP # 2 IS LOCATED IN THE ELEVATOR |
| | LOBBY. IT SHOULD BE RELOCATED FROM |
| | THIS LOCALE. |
| | |
| | 28) CIVIL DRAWINGS SHOW A 6" FIRE LINE. |
| | THIS LINE IS TWO SMALL. |
| | |
| | 29) TAMPER SWITCHES REQUIRED ON FIRE |
| | LINE BACKFLOW DEVICE. |
| | |
| | 30) PLEASE CLEARLY ILLUSTRATE EXISTING |
| | FIRE HYDRANT LOCATIONS ON SITE PLAN. |
| | |
| | MIKE CARSILLO, ASSISTANT FIRE MARSHAL |
| | 835-2910 |