| 2003-06-11 00:00:00 | BUILDING REVIEW CHECKLIST: |
| | 1-PAY IMPACT FEES. BRING BACK RECEIPT & |
| | STAMPED PLANS. |
| | 2-ENERGY CALCULATIONS: A)A/C AREA DOES |
| | NOT MATCH PLANS. SEE PLANS. |
| | B)ENERGY CALCULATIONS FOR A MODEL NEEDS |
| | TO BE WORST CASE SCENARIO. OTHERWISE, |
| | SITE SPECIFIC ORIENTATION IS REQUIRED. |
| | ORIENTATION FOR THIS HOUSE DOES NOT |
| | MATCH ENERGY CALCULATIONS. REVISE AS |
| | REQUIRED. WORST CASE OR SITE SPECIFIC. |
| | C)REVISE UNDER ATTIC AREA TO COMPLY WITH |
| | SEC. 602.1ABC.1.2 CHAPTER 13 FBC 2001. |
| | 3-PROVIDE SOIL TEST REPORT. |
| | 4-PROVIDE GENERAL SPECIFICATIONS FOR |
| | FIREBLOCKING AT ALL CONCEALED SPACES. |
| | SEC. 2305 FBC 2001. |
| | 5-DETAIL 5/A5 NEED TO BE REVISED. NEED |
| | 2X TO SUPPORT WINDOW. SEE PRODUCT |
| | APPROVAL. |
| | 6-PROVIDE COMPLETE SPECS FOR GARAGE DOOR |
| | STRUCTURAL BUCK. NEED ANCHOR EMBEDMENT |
| | AND WASHER. SEC. 104.2.1.2 CITY AMEND. |
| | 7-REVISE ROOF NAILING ZONE DIAPHRAGM. |
| | SEE FIGURE 1606.2(C) FBC 2001 FOR ALL |
| | CONSIDERED ZONE AREA 3. |
| | 8-UPDATE TRUSS ANCHOR SCHEDULE AND ALL |
| | DETAILS THAT NEED TO BE REVISE TO |
| | COMPLY WITH SEC. 1606.9.4.3 FBC 2001. |
| | 9-PROVIDE PRODUCT APPROVAL FOR: |
| | A)ROOF TILE. |
| | B)ENTRY DOORS WITH UPDATED DADE COUNTY |
| | REPORT WITH LOGO AT BOTTOM LEFT OF |
| | FIRST PAGE. ALSO, LEGIBLE DRAWINGS W/ |
| | UPDATED DADE COUNTY STAMP. |
| | C)GARAGE DOOR WITH LEGIBLE DRAWINGS. |
| | D)AS PER THE BUILDING OFFICIAL ALL SITE |
| | SPECIFIC PRODUCT APPORVALS TO HAVE |
| | PROFESSIONAL OF RECORD SIGNING AND |
| | SEALING SAME SITE SPECIFIC FORM (OR |
| | LETTER CLEARLY IDENTIFYING ALL SITE |
| | SPECIFIC PRODUCT THAT WERE APPROVED). |
| | **SEE COMMENTS ON RETURNED PRODUCT |
| | APPROVALS. |
| | E)PRODUCT APPROVAL FOR STRUCTURAL |
| | MULLION ABOVE SLIDING GLASS DOORS. |
| | F)GLASS BLOCK WITH LEGIBLE DRAWINGS. |
| | 10-SPECIFY PRODUCT APPROVAL WERE REQ'D. |
| | SEE PLANS FOR COMMENTS. |
| | 11-SPECIFY SIZE OF WOOD COLUMNS SHOWN |
| | ON FRAMING PLAN. SEE SHEET A-5 FOR |
| | ADDITIONAL COMMENTS. |
| | 12-SEE SHEET A6 FOR ADDITIONAL COMMENTS. |