| Date |
Text |
| 2003-05-20 00:00:00 | BUILDING DENIED |
| | |
| | 1) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 2) SUBMIT THE PAID RECEIPT FOR THE |
| | IMPACT FEES. |
| | |
| | 3) SUBMIT A SOIL BORING TEST REPORT AS |
| | REQUIRED BY CITY AMEND. TO FBC 1804.2.2. |
| | |
| | 4) THE OWNER INFORMATION LISTED ON THE |
| | APPLICATION DOES NOT MATCH THE OWNER OF |
| | RECORD WITH THE CITY OR COUNTY. |
| | |
| | 5) THE OWNER AND CONTRACTOR INFORMATION |
| | ON THE ENERGY CALCULATIONS DOES NOT |
| | MATCH THE APPLICATION OR CITY RECORDS. |
| | |
| | 6) REVISE STUCCO NOTES ON A5. SPECIFY |
| | THE FASTENER SIZE IN NOTE 3. INDICATE IN |
| | NOTE 7 THAT 3/8" HIGH RIB METAL LATH IS |
| | REQUIRED TO BE FASTENED AT EVERY RIB |
| | (4"O.C.). NOTES 4 AND 5 ARE EXACTLY THE |
| | SAME. |
| | |
| | 7) SPECIFY THE LENGTH/EMBEDMENT DEPTH OF |
| | THE 1/2" DIAMETER EXP. ANCHORS AT THE |
| | WOOD FRAME TO CONCRETE WALL DETAIL ON A6 |
| | UPDATE THE SEMCO TPP4 OR TPP6 CONNECTORS |
| | SEMCO WAS PURCHASED BY USP. |
| | |
| | 8) THE COLUMN SCHEDULE ON S-1 LISTS C2 |
| | AS (2) 2X4 POSTS AND THE NOTE ON THE |
| | FOUNDATION PLAN SPECIFIES (3) 2X4 WOOD |
| | POSTS AT C2. PLEASE CLARIFY. |
| | |
| | 9) THE SURVEYS SUMITTED DO NOT MATCH THE |
| | PLANS AT THE COVERED PATIO. |
| | |
| | 10) REVISE THE UPLIFT VALUES FOR THE |
| | TRUSS CONNECTORS TO REFLECT THE VALUES |
| | THAT DO NOT HAVE STRESS INCREASES FOR |
| | THE STEAL CALCULATIONS. SEE 2003 USP |
| | CATALOG AND FBC 1609.4.3. |
| | |
| | 11) ONE OF THE LOCATIONS WHERE THE STEEL |
| | COLUMN CAP DETAIL 4 ON S2 IS SPECIFIED |
| | IS SHOWN ON THE FLOOR PLAN CARRYING TWO |
| | GIRDERS AT 90 DEGREE ANGLES. THIS IS NOT |
| | INDICATED BY THE DETAIL. |
| | |
| | 12) DETAIL 1 ON S2 DOES NOT INDICATE HOW |
| | THE FLOOR TRUSS IS ATTACHED TO THE BLOCK |
| | WALL. |
| | |
| | 13) THE "USP" RT20T CONNECTOR IN DETAIL |
| | 3 ON S2 REQUIRES (14) NAILS EQUALLY |
| | DISTRIBUTED ON EACH SIDE OF THE |
| | CONNECTION PER USP CATALOG. |
| | |
| | 14) THE ROOF SHEATHING NAILING ZONE |
| | DIAGRAM DOES NOT INDICATE THAT THE |
| | GABLE ENDS AT THE GARAGE AND SECOND |
| | FLOOR BATHROOM ARE ZONE 3. |
| | |
| | 15) SUBMIT PRODUCT APPROVALS FOR THE |
| | SLIDING GLASS DOORS. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |