Plan Review Notes
Plan Review Notes For Permit 03040477
Permit Number 03040477
Review Stop P
Sequence Number 2
Notes
Date Text
2003-06-11 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 CHAPTER 11
  
 1) SHTS P2.1 & P5.1 CLEANOUTS REQUIRED
 BY SECTION 708.3.3 REQUIRED. PLEASE SHOW
 ON FLAT LAYOUT AND SANT. RISER DIAGRAM.
 "CLEANOUTS SHALL BE INSTALLED AT EACH
 CHANGE OF DIRECTION OF THE BIILDING
 DRAIN OR HORIZONTAL WASTE OF SOIL LINES
 GREATER THAN 45 DEGREES. WHERE MORE THAN
 ONE CHANGEOF DIRECTION OCCURS IN A RUN
 OF PIPING, ONLY ONE CLEANOUT SHALL BE
 REQUIRED FOR EACH 40 FEET OF DEVELOPED
 LENGTH OF THE DRAINAGE PIPING."
 2) SHT P5.2 A RELIEF VENT IS REQUIRED AS
 THE CONDENSATE DRAIN EXITS THE BLDG. IN
 CASE OF BACKUP IN THE STORM SYSTEM,
 (CATCH BASIN), THE RELIEF VENT SHALL
 KEEP THE STORM WATER FROM BACKING UP IN-
 TO THE BLDG.
 3) SHT P6.1 FULL OPEN VALVES REQUIRED AT
 THE BASE OF EACH RISER. SEC 606.1(3).
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377
 (561) 805-6721
 FAX (561) 653-2692


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved