| Plan Review Notes For Permit 03040100 |
| Permit Number |
03040100 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2003-04-19 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | | | | 1) SHT A-1 RM 102A SINK SHALL COMPLY | | | WITH SECTION 11-4.24 AND ALL ALL SUB- | | | SECTIONS. PLEASE PROVIDE DETAILS. | | | 2) SHT A-1 SHOW 5' TURNING RADIUS IN ALL | | | TOILET ROOMS. 11-4.22.3 | | | 3) SHT A2 TOILET ROOM #221 TO BE ACCESS- | | | IBLE PER 11-4.1.3(11). PLEASE SHOW DE- | | | TAILS PER 11-4.23 AND ALL SUBSECTIONS. | | | 4) SHT M-2 WATER ISOMETRIC, | | | A) SHUT OFF VALVE REQUIRED ON WATER | | | HEATER. SEC 606.1(7). | | | B) SHUT OFF VALVES REQUIRED FOR RE- | | | CIRCULATING PUMP. SEC 606.2(3) | | | C) THERMAL EXPANSION CONTROL REQUIRED | | | PER SECTION 607.3.2 | | | D) A WATER HAMMER ARRESTOR SHALL BE IN- | | | STALLED WHERE QUICK CLOSING VALVES ARE | | | UTILIZED. (WASH MACHINES - DISH WASHERS | | | AND ICE MAKERS) FBC-2001 SEC 604.9 | | | LOCATED NEAR THE FIXTURE IN AN "EFFECT- | | | IVE RANGE" PER PDI-WH 201 AND MANUF. IN- | | | STALLATION INSTRUCTIONS. NOT AT THE TOP | | | OF THE DROPS IN THE CEILING. | | | 5) AN RPZ BACKFLOW IS REQUIRED ON WATER | | | SERVICE. | | | 6) SHT M-1 CONDENSATE LINE SHALL HAVE A | | | RELIEF VENT, (OVERFLOW), AS IT EXITS THE | | | BLDG. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 | | | (561) 805-6721 | | | FAX (561) 653-2692 |
|