| Date |
Text |
| 2003-04-21 00:00:00 | **********CORRECTIONS************ |
| | |
| | 1.)PROVIDE A FOOTPRINT OF THE HOUSE |
| | SHOWING WINDOWS TO BE REPLACED (NOT |
| | WINDOWS BEING REGLAZED).INDICATE |
| | BEDROOM WINDOWS, IF ANY.FBC 1004.5. |
| | |
| | 2.)WINDOWS BEING REPLACED (NOT |
| | REGLAZED) ARE TO HAVE HURRICANE |
| | PROTECTION, FBC1606.1.4, FBC 3401.7.2.4. |
| | |
| | 3.)SUBMIT 2 COPIES OF PRODUCT |
| | APPROVALS FOR THE FOLLOWING: |
| | WINDOWS (REPLACEMENT ONLY, NOT |
| | WINDOWS TO BE REGLAZED) |
| | HURRICANE SHUTTERS |
| | EXTERIOR DOORS BEING REPLACED |
| | |
| | 4.)WHEN SUBMITTING PERMITTING |
| | PAPERWORK, PLEASE ALWAYS SUBMIT TWO |
| | COPIES.ONE COPY REMAINS IN OUR RECORDS |
| | AND ONE IS FOR YOUR PERMIT SET.ONLY |
| | ONE SEALED SET OF STRUCTURE INSPECTION |
| | RESULTS WAS SUBMITTED; 2ND COPY OF |
| | REPAIR DETAILS WAS NOT SEALED. |
| | |
| | 5.)WHEN INDICATING AN ATTACHMENT, |
| | EITHER SPECIFY BRAND AND TYPE, OR GIVE |
| | UPLIFT REQUIREMENTS.DETAILS SHOULD |
| | INCLUDE TYPE OF LUMBER, SIZE, AND |
| | SPECIFIC ATTACHMENTS. |
| | |
| | 6.)FOR CLARITY, LABEL THE VARIOUS |
| | ATTACHMENT DETAILS (A, B, C, ETC.) AND |
| | ON THE STRUCTURE INSPECTION RESULTS AND |
| | REPAIR DETAILS SHEET, REFER TO THE |
| | SPECIFIC DETAIL FOR THE VARIOUS ITEMS. |
| | |
| | 7.)THE WALL FRAMING/WALL SHEATHING |
| | DETAIL SHEETS ARE NOT LEGIBLE.PLEASE |
| | SUPPLY LEGIBLE COPIES.ALSO IT REFERS |
| | TO AN ATTACHMENT SCHEDULE FOR THE BOTTOM |
| | PLATE WHICH IS NOT ON THE SHEET.THE |
| | NAILING SCHEDULE AT THE TOP OF THE PAGE |
| | CONFLICTS WITH THE NAILING IN THE TEXT |
| | OF THE DIAGRAM. |
| | |
| | 8.)PROVIDE A TITLE BLOCK FOR ALL |
| | SEALED SHEETS.SEALS SHOULD BE DATED |
| | AS WELL AS SIGNED. |
| | |
| | 9.)BEFORE A PERMIT CAN BE ISSUED, |
| | THE HOLDS ON THIS PROPERTY MUST BE |
| | ADDRESSED.SEE ATTACHED. |
| | |
| | IF YOU HAVE ANY QUESTIONS, PLEASE CALL |
| | SAMANTHA THYNG, BUILDING PLANS EXAMINER |
| | [email protected] |