| 2004-11-06 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 1 |
| | |
| | |
| | 1) SHT P-1.2 UNABLE TO LOCATE REVISION |
| | NUMBER ONE. MANY CHANGES ON PLANS WITH |
| | NO CLOUDS OR REVISION NUMBERS - CLOUD |
| | AND NUMBER ALL REVISIONS SUBMITTED FOR |
| | REVIEW. SECTION 104.2.1 |
| | 2) SHT P-1.3 10" (10,830 INDICATE SF FOR |
| | ALL PIPING UPSTREAM OF 10" BETWEEN COLS. |
| | J & S AT COL. 14. - NO REVISION NUMBER |
| | FOR CLOUD AT COLS. 1.1 THRU 7.1 BETWEEN |
| | COLS. T.1 & U.4. SHOW REVISION NUMBER. |
| | SECTION 104.2.1 |
| | 3) SHT P2.2 NOTE TO CONTRACTOR: ENGINEER |
| | INDICATED THAT GAS PIPING WAS TO BE |
| | SCREW PIPING. NOTE STATES WELDED PIPE. |
| | PLEASE CLARIFY. SECTION 104.2.1 |
| | 4) REMOVE ALL SHEETS NOT PART OF THE |
| | REVISION. DO NOT SUBMIT VOIDED SHEETS. |
| | SECTION 1014.2.1.3 |
| | 5) SHT P-2.4 INDICATE WHAT BLDG DEPT |
| | COMMENTS GENERATED REVISIONS 1 & 13. |
| | REVISION 11 & 12 WERE NOT FOUND. |
| | ORIGNIAL PERMIT STAMPED SET OF PLANS ALL |
| | READY HAS REVISIONS 1 & 13. PLEASE |
| | CLARIFY. SECTION 104.2.1 |
| | 6) SHT P-2.5 DOWNSTREAM OF SR/46 SHOWS |
| | 202 DFU, 4' PIPE, THEN SR/48 ADDS 33 DFU |
| | FOR 193 DFU. PLEASE CLAARIFY. DOWNSTREAM |
| | OF SR/49 TOTAL IS 277 (193 & 44). PLEASE |
| | CLARIFY. PLEASE RECHECK ALL DFU'S IN THE |
| | SYSTEM. - PREVIOUS REVISIONS 11 & 13 ON |
| | THE PERMIT STAMPED SET OF PLANS. PLEASE |
| | CLARIFY. SECTION 104.2.1 |
| | 7) SHT P-2.6 SUBMIT BLDG DEPT COMMENTS |
| | THAT RESULTED IN REVISIONS 1 & 13. THESE |
| | NUMBERS WERE ON STAMPED SET OF PLANS. |
| | PLEASE CLARIFY. - THERE ARE MORE |
| | REVISIONS TO THE STAMPED SET OF PLANS |
| | THAT ARE NOT CLOUDED OR NUMBERED. |
| | SECTION 104.2.1 |
| | 8) SHTS P-4.4 & P-5.1 RISER UR-3 TUB NOT |
| | VENTED ON THE RISER OR ON THE FLOOR |
| | PLAN |
| | SECTIONS 104.2.1/901.2.1 |
| | 9) SHT P-5.2 VENTING CHANGES NOT CLOUDED |
| | OR NUMBERED. INDICATE COMMENTS REFERRED |
| | TO FOR REV'S 1 & 13. RISERS DO NOT |
| | REFLECT THE CHANGES FROM COMMENT #11 |
| | FROM THE PREVIOUS REVISION REVIEW. - |
| | THIS COMMENT FOR SHEETS P-5.3, P-5.3.2, |
| | ALSO. SHT 104.2.1 |
| | 10) SHT P-5.5 REVISIONS WITH NO CLOUD OR |
| | NUMBER ON SANT. LINE FROM SR/192 TO |
| | SANT |
| | DOWNSTREAM OF GREASE INTERCEPTOR, AND 2 |
| | AREAS OF RISER DO NOT REFLECT FLOOR PLAN |
| | AT SR/128 & AT SR/6 & SR/7 (SEE SHT |
| | P-2.4) - 8"(1471 DFU), 12 FROM (3975 |
| | DFU) THRU 12" (4269 DFU) SHALL BE |
| | MINIMUM 1/8" PER FT. SLOPE. INDICATE ON |
| | PLANS. SECTION 104.2.1. - SHOW LENGTH OF |
| | PIPE FOR GAS ISOMETRIC MISSING FROM |
| | STAMPED SET OF PLANS. |
| | 11) SEE ATTACHED SHEET FROM PREVIOUS |
| | REVISION REVIEW. SOME COMMENTS WERE NOT |
| | ADDRESSED AND STILL APPLY. |
| | |
| | |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 805-6721 |
| | FAX (561) 653-2692 |
| | E-MAIL [email protected] |