| Date |
Text |
| 2003-03-20 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 424.2 SWIMMING POOLS |
| | |
| | A) PLEASE ADJUST YOUR NOTES, DETAILS, OR |
| | SUBMITTALS TO REFLECT THE FOLLOWING IN- |
| | FORMATION REQUIRED FOR PLAN REVIEW |
| | 1) FBC-2001 SEC 424.2.6.1 ENGINEERING |
| | DESIGN, CONSTRUCTION AND WORKMANSHIP. |
| | ANSI/NSPI-4 92, AND NSPI-5. (ADD TO |
| | NOTES) |
| | 2) FBC-2001424.2.6.6.2 SHOW COMPLIANCE |
| | WITH ANSI/ASME A112.19.8M. PROVIDE MODEL |
| | NUMBER AND MANUF INFO FOR VAC LOCK. |
| | (GIVE DETAIL OR ADD NOTE)(SUBMITTAL) |
| | VACUUM NOT FOUND ON POOL LAY OUT, BUT |
| | ITS CALLED FOR IN GENERAL SPECIFICATIONS |
| | 3) FBC-2001424.2.6.6.5 WHERE PROVIDED, |
| | THE VACUUM OR PRESSURE CLEANER FITTING |
| | SHALL BE LOCATED AT LEAST 6" AND NOT |
| | GREATER THAN 12" BELOW THE MINIMUM OPER- |
| | ATING WATER LEVEL OR AS AN ATTACHMENT TO |
| | THE SKIMMER. (GIVE DETAIL) |
| | 4) FBC-2001 424.2.12.1 PRESSURE TESTS. |
| | PER MANUFACTURE RECOMMENDATIONS, NO AIR |
| | TEST SHALL BE APPROVED FOR PVC PIPE AND |
| | FITTINGS. (ADD TO NOTES) |
| | 5) GENERAL NOTES #5 NOT APPLICABLE. |
| | PLEASE UPDATE TO CORRECT FBC-2001 |
| | 6) 50% OF ONE DETAIL SHEET IS BLANK. |
| | PLEASE REVIEW PLANS PRIOR TO SIGNING & |
| | SEALING. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 659-8096 EXT 8377 |