Date Text
2003-04-19 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
  
 1) ALL DEMO'D AND CAPPED PIPES SHALL BE
 INSPECTED PRIOR TO COVERING.
 2) SHT P2.09A PLEASE IDENTIFY VALVES ON
 HOT WATER CIRCULATING LINE, NOT FOUND
 ON PLUMBING LEGEND - SHT P0.01
 3) SHTS P2.10B, P2.10C, & P5.04, OVER-
 FLOW DRAIN AT COL'S 18/U MINIMUM 8" REQD
 @ 2975 SQ FT. EXTEND CONNECTION TO 2ND
 OVERFLOW DRAIN AND INCREASE PIPE SIZE TO
 8". TABLE 1106.3 - SECTION 1107.3
 4) SHT P2.10B 4" W & T AT CLASSROOM
 1-350 APPEARS TO DRAIN TO 6" R.W.L.
 PLEASE CLAIRFY. PLEASE INDICATE WHAT
 THIS SYSTEM DRAINS.
 5) SHTS P4.01 & P5.04 CONDENSATE SHALL
 DRAIN TO FLOOR SINKS. SECTION 803.2
 HUB DRAINS NOT APPROVED.
 6) SHTS P2.10CU & P5.01 ICE DISPENSORS
 #095895, & # 203201 SHALL DRAIN INDIREC-
 TLY INTO A FLOOR SINK. SECTION 802.3.
 7) SHT P5.01 CLINICAL SINK, P-7A, PLEASE
 CLAIRFY IF THESE SINKS HAVE INTERNAL
 TRAPS OR NOT. NONE ARE SHOWN ON RISER.
 8) SHTS P2.11 & P5.01 SINKS P20B SHOW
 2" SANT ON FLOOR PLAN BUT 3" PIPE ON
 SANT. RISER. PLEASE CLAIRFY.
 9) SHT P5.04 PHASE 10 PART B EXISTING 2"
 ROOF DRAIN. PLEASE PROVIDE SQ. FOOTAGE
 DRAINED BY THIS DRAIN PER SEC 1106.
 10) SHT P5.04 - THE FOLLOWING INFORMAT-
 ION IS REQUIRED FOR GAS PERMIT.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE. - PLEASE PROVIDE LENGTHS
 FOR SYSTEM AFTER REGULATOR.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED.
 C. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34). PLEASE PROVIDE BTU'S ANTICIPAT-
 ED FOR FUTURE USE.
 D. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 PLEASE INDICATE PRESSURE FOR SYSTEM
 AFTER REGULATOR.
 E. SUBMIT A DETAIL SHOWING THE TYPE,
 LOCATION, SIZE AND TERMINATION OF THE
 GAS VENTS PER FBC-2001 FUEL GAS CODE
 SECS. 502 THRU 506.
 F. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 G) PLEASE INDICATE TABLE IN FBC-2001
 FUEL GAS CODE THAT IS BEING USED TO
 SIZE PIPE FOR HIGH PRESSURE & MEDIUM
 PRESSURE SYSTEMS.
 11) SHT P6.01 FILM PROCESOR DETAIL, PER
 SECTION 803.3 A FLOOR SINK WILL BE RE-
 QUIRED FOR INDIRECT WASTE. FLOOR DRAINS
 ARE NOT AN APPROVED RECEPTOR.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377
 (561) 805-6721
 FAX (561) 653-2692


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved