2003-03-14 00:00:00*************** UNSAT ***************
  
 1)NOTE: PLEASE SHOW ALL CIRCUITING FOR
 BRANCH WIRING. NOTE MENTIONS SEE HEAD-
 BOARD DETAIL FOR CIRCUIT DETAIL? PLEASE
 CLARIFY WHERE THIS IS?
  
 2)NOTE: PLEASE SEE 220-13 FOR LOADING
 OF BRANCH CIRCUITS(KVA PER RECEPT)
 PLEASE SEE POWER SHEETS, PLEASE CLARIFY
 CIRCUITS WHICH SEEM TO EXCEED LOADING
 PERMITTED IN NEC. SOME ARE SHOWN WITH
 MORETHAN ONE CIRCUIT? PLEASE EITHER NOTE
 ON PLANS: MAX # PERMITTED OR PLEASE
 DIVIDE CIRCUITS.
  
 3)NOTE: PLEASE CLARIFY RECEPTS REQ`D FOR
 ROOFTOP EQUIPMENT. 210-63
  
 4)NOTE: PLEASE SEE DETAILS SHOWN FOR
 GROUNDING, PLEASE NOTE, CODES SHOWN ARE
 FROM "96" NEC. WE ARE CURRENTLY UNDER
 THE 99 NEC. PLEASE CORRELATE.
 PLEASE ALSO SHOW COLD WATER PIPE AS
 PART OF THE GROUNDING ELECTRODE SYSTEM.
 250-50/250-32
  
 5)NOTE: PLEASE SEE 225-31 FOR MEANS OF
 DISCONNECT REQ`D COMING FROM GENERATOR
 TO MAIN BLDG. PLEASE SEE 230-76/ 230-79
 FOR DISCONNECTING REQUIREMENTS. PLEASE
 NOTE, THAT SHUNT TRIPS WILL NOT BE
 PERMITTED BY THE AHJ.
 PLEASE ALSO PROVIDE INFORMATION WHERE
 2HR FIRE RATED SEPARATION FORM EXISTING
 BLDG W/ EXISTING ELECTRICAL SERVICE
 IS FED FROM. PLEASE NOTE COMPLETE
 SEPARATION OF THESE NEW AND OLD WILL BE
 REQ`D DUE TO FACT THEY ARE FED FROM TWO
 SEPARATE ELECTRICAL SERVICES. PLEASE
 ALSO NOTE, LABELING AND COMPLETE SIGNAGE
 WILL BE REQ`D W/ A MIN OF 1" LETTERING
 ON A CONTRASTING BACKGROUND.
  
 6)NOTE: PLEASE ALSO SEE 96 NEC REF
 ON LINE DIAGRAM.
  
 7)NOTE: PLEASE SEE SIZING SHOWN FOR
 TRANSFER SWITCH "LS", MISPRINT AT 260A`S
  
 8)NOTE: PLEASE CLARIFY 3000A SWITCHBOARD
 W/TWO 1600A MAINS? 3200A? PLEASE CLARIFY
 HOW MAINS CNA EXCEED RATING OF SWITCH-
 -BOARD?
  
 9)NOTE: PLEASE CORRELATE RISER DIAGRAM
 AND SW BRD ES-1. CRBR SHOWS 600A ON
 RISER AND 800A ON PANEL SCHEDULE.
  
 10)NOTE: PLEASE COMPLETE RISER DIAGRAM
 W/ ALL CONDUIT AND WIRE SIZES. PLEASE
 SUBMIT A FEEDER SCHEDULE, SEEMS TO HAVE
 #`S ON RISER?? SUBMIT ALL WIRE SIZES ON
 PANEL SCHEDULES ALSO.
 11)NOTE: PLEASE COMPLETE LOAD CALCULAT-
 -IONS. PLEASE SHOW FINAL AMPERAGE ON
 EACH PANEL AND ON MAIN SERVICE.
 PLEASE SHOW LOAD CALC PER 220-3,220-10
 220-11,220-13, PLEASE ALSO SHOW ALL
 CONTINUOUS LOADS AT 125% 215-3/230-42ETC
  
 12)NOTE: PLEASE PROVIDE GROUNDING FOR
 ALL TRANSFORMERS PER 250-30
 PLEASE SHOW DETAIL.
  
 13)NOTE: PLEASE SEE RISER DIAGRAM,
 1CHEM1, SHOWS THREE TRANSFORMERS FEEDING
 TWO PANELS? 2-45 KVA'S AND ONE 75KVA TO
 THE SAME PANEL? PLEASE CLARFIY HOW TWO
 X-FORMERS ARE FEEDING ONE PANEL. PLEASE
 ALSO CLARIFY PANEL SCHEDULE.
  
 14)NOTE: PLEASE SUBMIT ALL PANEL
 SCHEDULES, SOME ARE MISSING.
  
 15)NOTE: PLEASE SEE PANEL 1 ELEM1, OTHER
 PANSL SHOWN ON SECONDARY SIDE OF X-FORM-
 -ERS ? 240-21/384-16
  
 PLEASE NOTE A COMPLETE PLAN REVIEW CAN
 NOT BE DONE AT THIS TIME. PLEASE SUBMIT
 THE ABOVE INFORMATION FOR REVIEW AND
 PLEASE ALSO NOTE THERE MAY BE FURTHER
 COMMENTS AFTER INFORMATION FOR REVIEW
 IS SUBMITTED.
  
 IF THERE ARE ANY QUESTIONS, PLEASE CALL.
  
  
 DEWEY PALMER
 ELECTRICAL PLAN REVIEW
 561-659-8096 EXT 8372
  
 PLEASE NOTE, IN ADDTION TO ABOVE COMMENT
 -S , PLEASE ALSO SEE 571-17 FOR GFI
 PROTECTION.