| Date |
Text |
| 2003-03-10 00:00:00 | BUILDING DENIED |
| | |
| | 1) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 2) SPECIFY ON THE PLANS THAT THE WWM IN |
| | THE SLAB IS TO BE SUPPORTED ON APPROVED |
| | MATERIALS AT 3 FT O.C. MAX. FBC 1909.3 |
| | |
| | 3) THE WINDOW IN BATH #2 IS REQUIRED TO |
| | HAVE SAFETY GLAZING BECAUSE IT IS WITHIN |
| | 3 FT HORIZONTALLY OF THE TUB/SHOWER. |
| | THIS IS NOT CLEARLY INDICATED BY GENERAL |
| | NOTE #9 ON SHEET 1. PLEASE REVISE. |
| | |
| | 4) SPECIFY THE SIZE OF THE ATTIC ACCESS |
| | ON THE PLANS. |
| | |
| | 5) PROVIDE A DETAIL OF THE RAKE BEAM AT |
| | THE REAR GABLE END THAT IS ADJACENT TO |
| | THE VAULTED CEILING. |
| | |
| | 6) THE EMBOSSED SEAL OF THE DESIGNER OF |
| | RECORD AND THE LOCATION OF THE JOB IS |
| | REQUIRED ON THE NORANDEX SITE SPECIFIC |
| | PRODUCT APPROVAL. |
| | |
| | 7) THE INFORMATION LISTED ON THE ENERGY |
| | CALCULATION FORM IS INCORRECT FOR THE |
| | R-VALUES OF THE EXTERIOR AND ADJACENT |
| | WALLS. PLEASE CORRECT. |
| | |
| | 8) PROVIDE THE MANUFACTURER'S SPECS. AND |
| | LISTING INFORMATION FOR THE ONE HOUR |
| | FIRE RATED GLASS BLOCK ASSEMBLY. |
| | |
| | 9) SOME OF THE OPENING SIZES LISTED IN |
| | THE STORM PANEL SCHEDULE DO NOT |
| | CORRESPOND WITH THE WINDOW SCHEDULE ON |
| | THE PLANS. PLEASE REVISE. |
| | |
| | 10) PROVIDE PRODUCT APPROVALS FOR A |
| | HORIZONTAL SLIDING WINDOW WITH AN XOX |
| | CONFIGURATION AS SHOWN ON THE PLANS. |
| | |
| | 11) THE LOMR INFORMATION ON THE SURVEY |
| | IS INCORRECT. PLEASE REVISE. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |