| 2003-07-15 00:00:00 | BUILDING DENIED |
| | |
| | 1) THE ENERGY CALCULATION FORMS ARE |
| | REQUIRED TO BE SIGNED AND SEALED BY THE |
| | OWNER/AGENT. |
| | |
| | 2) SUBMIT SIGNED AND SEALED COPIES OF |
| | THE TEST REPORT FOR THE 90 DEGREE |
| | SLIDING GLASS DOORS. |
| | |
| | 3) THE ENGINEERING FOR THE BAY WINDOW |
| | MULLION REFERENCES THE WRONG LOT NUMBER. |
| | SITE SPECIFIC ENGINEERING IS REQUIRED TO |
| | BE REVIEWED AND APPROVED BY THE DESIGNER |
| | OF RECORD FOR THE STRUCTURE. THE NOTES |
| | ON THE DRAWING INDICATE THAT THE MULLION |
| | IS NOT CAPABLE OF SUPPORTING THE DEAD |
| | LOADS OF THE WINDOWS ABOVE AND THE |
| | PRODUCT APPROVAL FOR THE STORE FRONT |
| | WINDOW WALL DOES NOT ADDRESS SUPPORTING |
| | ANY DEAD LOAD FROM ABOVE. THERE ARE NO |
| | OVERALL DIMENSIONS FOR THE MULLION GIVEN |
| | |
| | 4) THE PRODUCT APPROVAL THAT SUBMITTED |
| | DOES NOT INDICATE THAT THE WINDOW WALL |
| | SYSTEM CAN BE INSTALLED ON A RADIUS. |
| | SITE SPECIFIC ENGINEERING WITH DRAWINGS |
| | AND ANALYSIS,WHICH HAS BEEN REVIEWED AND |
| | APPROVED BY THE DESIGNER OF RECORD, IS |
| | REQUIRED. TESTING OF THE ASSEMBLY IS |
| | REQUIRED FOR IMPACT RESISTANCE. THE |
| | ASSEMBLY AS INDICATED ON THE PLANS IS |
| | THE UPPER AND LOWER WINDOW WALL SYSTEMS |
| | AND THE MULLION BETWEEN THEM. IF THE |
| | ASSEMBLY IS NOT TESTED, THEN IT MUST BE |
| | SHUTTERED. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)805-6714 |