2003-01-25 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 11
  
 1) SHT A2 DEMO NOTES #'S 4,5,& 9, ALL
 PIPES CAPPED OFF IN FLOOR OR WALLS SHALL
 BE INSPECTED PRIOR TO COVERING.
 2) SHT A2 PLEASE CLAIRFY PREP AREAS. IF
 SERVING FOOD, PLEASE NOTE THAT PLANS MAY
 HAVE TO BE ROUTED TO THE HEALTH DEPT. IF
 THESE ARE BREAK ROOMS, SINKS SHALL COM-
 PLY WITH SECTION 11-4.24 AND ALL SUB-
 SECTIONS AND A DETAIL WILL BE REQUIRED.
 3) SHT A3 PLEASE SUBMIT CALCULATIONS FOR
 PRIMARY AND SECONDARY ROOF DRAINS. SHOW
 1/2 AREA FOR ALL VERTICAL WALLS INCLUD-
 ING PARAPET WALLS IN CALCULATIONS. INDI-
 CATE LOCATION, NUMBER, & SIZE OF ALL
 DOWNSPOUTS AND IF ROOF IS FLAT OR PITCH-
 ED.
 4) SECTION 11-4.1.2(6) IF TOILET FACIL-
 ITIES ARE PROVIDED ON A SITE THEN EACH
 SUCH PUBLIC OR COMMON USE TOILET FACIL-
 ITY SHALL COMPLY WITH 11-4.22. IF BATH-
 ING FACILITIES ARE PROVIDED ON A SITE,
 THEN EACH SUCH PUBLIC OR COMMON USE
 BATHING FACILITY SHALL COMPLY WITH
 11-4.23
 5) SHT A4 TOILET ROOMS SHALL COMPLY WITH
 SECTION 11-4.22 & ALL SUBSECTIONS.
 PLEASE SHOW ON DETAILS. (SEE SECTIONS
 11-4.16, 11-4.18, SHOW 5'TURNING RADIUS
 IN EACH TOILET ROOM, SEE FIG.28, DOORS
 SHALL NOT OPEN INTO ANY CLEAR FLOOR
 SPACE OR TURNING RADIUS ECT,)
 6) SHT A4 SHOWER STALLS SHALL COMPLY
 WITH 11-4.21 AND ALL SUBSECTIONS. PLEASE
 SHOW ON DETAILS.
 7) SHT P-2 SANITARY RISER DIAGRAM,
 DRINKING FOUNTAIN IS NOT SHOWN.
 8) SHT P-2 WATER RISER DIAGRAM, DRINKING
 FOUNTAIN IS NOT SHOWN. WATER HAMMER ARR-
 ESTORS ARE REQUIRED AT WASH MACHINE, ICE
 MAKER AND DISHWASHER IF PROVIDED. SECT.
 604.9
 9) SHT P-3 WATER HEATER DETAIL, THERMAL
 EXPANSION CONTROL REQUIRED. SEC 607.3.2
 PLEASE SHOW EXPANSION TANK.
 10) SHT P-3 GENERAL NOTES #16, AIR
 CHAMBERS ARE NOT APPROVED. PLEASE DELETE
 REFERENCE.
 11) SHT P-1 SEPARATE GAS PERMIT REQUIRED
 SEE FOLLOWING LIST OF GAS APPLICATION
 REQUIREMENTS.
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 3. TYPE OF GAS, (LP OR NATURAL)
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 THE FBC-2001 FUEL GAS CODE SECS. 401.8
 THRU 402.5.2 AND TABLES 402(1) THRU
 402(34).
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 6. SUBMIT CALCULATIONS FOR COMBUSTION
 AIR (IF APPLICABLE) PER FBC-2001 FUEL
 GAS CODE SECTION 304.
 7. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC. 402.2.
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 10. CLEARLY SHOW THE LOCATION AND CAP-
 ACITY OF LP TANK(S), TYPE OF TANK (DOT
 OR ASME), THE DISTANCE OF THE TANK FROM
 THE BUILDING AND ADJACENT PROPERTY LINES
 THE DISTANCE OF THE TANK FROM ALL SOUR-
 CES OF IGNITION, OTHER CONTAINERS, BUILD
 INGS, AND THE LOCATION OF ANY BUILDING
 OPENINGS BELOW THE RELIEF VALVE OF THE
 TANK PER NFPA 58, TABLE 3-2.2.2.
 11. CLEARLY INDICATE ON THE PLAN IF THE
 LP TANK IS ABOVE OR BELOW GROUND, AND
 SHOW REQUIRED PROTECTION OF THE TANK AND
 APPURTENANCES PER NFPA 58. IF THE TANK
 IS BELOW GROUND THE CONTAINER SHALL BE
 SECURILY ANCHORED PER NFPA 58 SECTION
 3-2.2.7(H).
  