| 2003-06-03 00:00:00 | BUILDING REVIEW CHECKLIST: |
| | 1-SOME DRAWINGS ARE MISSING EMBOSSED |
| | ARCHITECT'S SEAL AS REQ'D BY CHAPTER |
| | 481 FLORIDA STATUTES WHEN SUBMITTING |
| | DOCUMENTS FOR PUBLIC RECORDS. |
| | 2-ENERGY CALCULATIONS ARE NOT INCLUDED |
| | IN THE PACKAGE. RESUBMIT. |
| | 3-PROVIDE SOIL TEST REPORT W/ ENGINEER'S |
| | ORIGINAL, SEAL SIGNATURE AND DATE AS |
| | REQ'DBY CHAPTER 471 WHEN SUBMITTING |
| | DOCUMENTS FOR PUBLIC RECORDS. |
| | 4-ALUMIMUM GUARDRAIL SYSTEM PACKAGE: |
| | A)IT DOESN'T SHOW COMPLIANCE WITH FBC |
| | 2001 SECTIONS 1015.3 AND 1608.2. (SEE |
| | OPENINGS REQUIREMENTS, INCLUDING AT |
| | BOTTOM RAIL AND LOAD DESIGN) |
| | B)ARCHITECT/ENGINEER OF RECORD TO REVIEW |
| | AND APPROVE (USE REVIEW STAMP) ALL |
| | SHOP DRAWINGS PRIOR TO SUBMITTAL TO |
| | THIS OFFICE. |
| | C)SAME APPLIES TO INTERIOR STAIRS. |
| | 5-PROVIDE 2 COPIES OF PRODUCT APPROVALS |
| | FOR DOORS AND WINDOWS ASSEMBLIES WITH |
| | TRANSOM OR SIDELITES AS SHOWN ON PLANS |
| | **NOTE: MISSILE IMPACT ASSEMBLIES AS |
| | SPECIFIED ON PLANS. |
| | 6-PROVIDE 2 COPIES OF PRODUCT APPROVALS |
| | FOR STRUCTURAL MULLIONS (IMPACT). |
| | 7-PROVIDE 2 COPIES OF PRODUCT APPROVALS |
| | FOR ROOF TILE. |
| | **NOTE: OWNER HAS THE OPTION TO PROVIDE |
| | PRODUCT APPROVAL INFO. AT A LATER TIME |
| | BUT UNDER SEPARATE PERMIT AND FEES AND |
| | PRIOR TO INSTALLATION. |
| | 8-UPDATE TRUSS ANCHOR SCHEDULE & DETAILS |
| | THAT ARE AFFECTED BY SEC. 1609.4.3 |
| | FBC 2001 WHERE THE 33% ALLOWABLE |
| | STRESS INCREASE IS NOT PERMITTED. SEE |
| | REVISED CONNECTOR'S CATALOGUE AND |
| | REVISE AS REQUIRED. |
| | 9-OWES $385.55 FOR UPDATED VALUATION AND |
| | RADON FEES. PLEASE PAY ATTACHED |
| | RECEIPT #225825. |