| Plan Review Notes For Permit 02120612 |
| Permit Number |
02120612 |
|
| Review Stop |
P |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2003-01-06 00:00:00 | DENIED | | | REFERENCE: FBC-2001 PLUMBING | | | FBC-2001 CHAPTER 11 | | | | | | 1) SHT AD-1 ALL CAPPED PLUMBING SHALL BE | | | INSPECTED PRIOR TO COVERING. | | | 2) SHT A-1 TOILET ROOM #153, PER SECTION | | | 11-4.1.6(1) ALL SPACES SHALL BE ACCESS- | | | IBLE. PER 1-4.1.6(2) 20% ABOVE CONTRACT | | | SHALL BE SPENT TO BRING SPACES UP TO NEW | | | CONSTRUCTION REQUIREMENTS. PLEASE SHOW | | | HOW THE $60,000 WILL BE SPENT. | | | 3) SHT A-4 DETAIL #04, SINK SHALL COMPLY | | | WITH 11-4.24 AND ALL SUBSECTIONS. PLEASE | | | PROVIDE DETAILS. | | | 4) SHT P-2 WATER HEATER DETAIL, PLEASE | | | COMPLY WITH 607.3.2. SHOW THERMAL EX- | | | PANSION CONTROL. | | | 5) SHT P-2 WATER RISER DIAGRAM, ALL | | | WATER HAMMER ARRESTORS REQUIRED BY SEC. | | | 604.9 SHALL BE LOCATED NEAR THE FIXTURE, | | | IN AN "EFFECTIVE RANGE" PER PDI-WH 201 & | | | MANUF. INSTALLATION INSTRUCTIONS, NOT AT | | | THE TOP OF THE DROP IN THE CEILING AS | | | SHOWN. | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|