| 2003-01-08 00:00:00 | BUILDING CHECKLIST: |
| | 1-MISSING ONE SET OF STRUCTURAL DRAWINGS |
| | 2-SPECIFY TABULATED AREAS. A/C AREAS, |
| | PORCHES, GARAGES.ETC. TO PROPERLY |
| | ASSESS VALUATION AND RADON FEES. |
| | 3-PROVIDE ENERGY CALCULATIONS AS REQ'D |
| | ON CHAPTER 13 FBC 2001. |
| | 4-PROVIDE SPECIFICATIONS FOR SHORING AND |
| | BRACING OF EXISTING STRUCTURE WHEN |
| | REMOVING BEARING WALLS.SECTION |
| | 104.2.1.2 CITY AMENDMENTS TO FBC 2001. |
| | 5-CLEARLY SPECIFY ON PLANS SIZE AND TYPE |
| | OF BEDROOM EGRESS WINDOWS. SECTION |
| | 1005.4.4 FBC 2001. |
| | 6-REVISE STRUCTURAL BUCK DETAIL FOR EXT. |
| | SWING DOORS. SEE SECTION 1707.4.4.2 |
| | FBC 2001. |
| | 7-SEE PLANS FOR ADDITIONAL COMMENTS. |
| | 8-AFTER CORECTIONS ARE DONE TO ORIGINAL |
| | DRAWINGS, PLEASE, RETURN OLD PLANS TO |
| | EXPEDITE REVIEW PROCESS. |
| | 9-NEED 2 SETS OF PRODUCT APPROVALS FOR: |
| | A)GARAGE DOOR: DRAWINGS ARE NOT LEGIBLE. |
| | B)CEMENT TILE PRODUCT APPROVAL EXPIRED. |
| | C)STORM SHUTTERS NEED: *LEGIBLE DRAWINGS |
| | WITH DADE COUNTY APPROVAL STAMP. |
| | **KEY PLAN AND INSTALLATION SCHEDULE AND |
| | CHECK ON DRAWINGS SPECIFIC MOUNTING |
| | CONDITIONS AND ANCHOR TYPE AND SPACING |
| | TO BE USED IN THIS PROJECT. |
| | D)SITE SPECIFIC PRODUCT APPROVAL FOR |
| | DOORS AND WINDOWS NEED: *UPDATE BLDG |
| | CODE REFERENCE. NEED FBC 2001 OR ASCE |
| | 7-98 NOT SFBC/ASCE 7-88. |
| | **USE UPDATE FORM FOR SITE SPECIFIC |
| | DOORS AND WINDOWS. SEE ATTACHED COPY. |
| | ***ENGINEER OF RECORD TO SIGN, SEAL AND |
| | DATE FORMS AS WELL. (REMAINDER: WRITE |
| | ALL HIS INFORMATION AS REQUIRED BY |
| | CHAPTER 471 OF FLORIDA STATUTES). |
| | 10-CONTRACTOR TO UPDATE WORKERS COMP. |
| | INSURANCE. |
| | 11-SEE ZONING AND MECHANICAL COMMENTS. |
| | 12-TRUSS DRAWINGS: *TRUSS ENGINEER TO |
| | SIGN, SEAL AND DATE TRUSS LAYOUT AND |
| | ENGINEERED TRUSSES. (SEE CHAPTER 471 |
| | FLORIDA STATUTES). COMPLETE ENGINEERED |
| | TRUSS PACKAGE TO BE ON THE JOB SITE |
| | FOR INSPECTOR'S INSPECTION. |
| | **TRUSS ENGINEERING TO INCLUDE DESIGN |
| | CRITERIA. |
| | ***ENGINEER OF RECORD TO REVIEW ALL |
| | TRUSS DRAWINGS PRIOR TO INSTALLATION. |