Plan Review Notes
Plan Review Notes For Permit 02111490
Permit Number 02111490
Review Stop P
Sequence Number 1
Notes
Date Text
2002-12-26 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 11
  
 1) PLEASE ROUTE PLANS TO PALM BEACH
 COUNTY HEALTH UNIT, DIVISION OF ENVIRON-
 MENTAL HEALTH, 901 EVERNIA ST W.P.B
 (561) 355-3018.SECTION 101.4.7
 2) CONTACT RODNEY COMPO, ENVIRONMENTAL
 COMPLIANCE, FOR GREASE TRAP REQUIREMENTS
 WASTE ORD. #2938-96 (561) 837-4074
 3) SHT D-1, NOTE G - DEMO PERMIT REQUIR-
 ED FOR PLUMBING.
 4) SHT A1.1 ROOM 104, DOOR SHALL NOT
 OPEN INTO THE CLEAR FLOOR SPACE OF LAV.
 5) PLEASE INDICATE CLEAR FLOOR SPACE FOR
 ALL HDCP FIXTURES, AND SHOW 5' TURNING
 RADIUS FOR EACH TOILET ROOM.
 6) SHT A1.3, PLEASE PROVIDE CALCULATIONS
 FOR THE PRIMARY & SECONDARY ROOF DRAINS,
 PER SECTIONS 1106 & 1107. INCLUDE 1/2
 AREA OF ALL VERTICAL WALLS. ALSO SHOW
 LOCATION OF ALL SECONDARY ROOF DRAINS.
 7) SHT A5.1, SCUPPER DETAIL, PLEASE IN-
 DICATE TOTAL AREA OF SCUPPER OPENING.
 THE ONLY DIMENSION SHOWN IS 4" HIGH.
 8) SHT A6.2, ROOM 115 DETAIL, SINK IN
 LOUNGE SHALL COMPLY WITH 4.24 AND ALL
 SUBSECTIONS. PLEASE SHOW ON DETAIL.
 9) SHTS FS-3 & P-3 ALL INDIRECT WASTE
 SHALL DRAIN INTO A FLOOR SINK. SECTION
 802.3. FUNNEL FLOOR DRAIN ON GREASE
 SYSTEM NOT APPROVED.
 10) SHT P-2, GREASE TRAP DETAIL, PLEASE
 SEE ATTACHED SHEET FOR APPROVED CITY OF
 WEST PALM BEACH STANDARD GREASE TRAP DE-
 TAIL.
 11) SHT P-3, STORM DRAIN ISOMETRIC, SIZE
 OF STORM DRAINAGE PIPING REQUIRED FOR
 BLDG. DRAIN.
 12) SHT P-4, WATER ISOMETRIC, AIR CHAMB-
 ERS ARE NOT APPROVED, PLEASE DELETE FROM
 ISO. ALL WATER HAMMER ARRESTORS REQUIRED
 BY 604.9 SHALL BE LOCATED NEAR THE FIX-
 TURES IN AN "EFFECTIVE RANGE" NOT IN
 CEILING AT TOP OF DROP.
 13) WILL THE FIXTURES FOR CHILDREN BE
 LOWERED PER ADA GUIDELINES FOR BUILDINGS
 & FACILITIES; BUILDING ELEMENTS DESIGNED
 FOR CHILDREN'S USE?
 14) FOLLOWING INFORMATION REQUIRED FOR
 APPLICATION FOR GAS (SEPARATE) PERMIT.
 A. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 FUEL GAS CODE.
 B. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 SPECIFICATION BOOK SHOWS "A" COPPER
 TUBING & "B" SCHED. 40 STEEL PIPE.
 PLEASE CLAIRFY.
 C. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 D. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND THE
 FBC-2001 FUEL GAS CODE SEC 402.2
 E. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE. - UNION NOT
 SHOWN ON PLANS.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved