| Date |
Text |
| 2003-02-05 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | FBC-2001 CHAPTER 11 |
| | |
| | 1) FROM PREVIOUS REVIEW: PLANS SHALL BE |
| | ROUTED TO DEPT. OF BUSINESS REGULATION |
| | HOTEL & RESTURANT DIVISION PRIOR TO RE- |
| | SUBMITTING TO CITY FOR REVIEW. PLANS |
| | SHALL BE STAMPED AND WORK SHEETS ATTACH- |
| | ED TO PLANS. |
| | 2) FROM PREVIOUS REVIEW: SHT P101 WATER |
| | RISER DIAGRAM, WATER HAMMER ARRESTORS |
| | SHALL BE LOCATED NEAR THE FIXTURE IN AN |
| | "EFFECTIVE RANGE" NOT AT THE TOP OF THE |
| | DROP IN THE CEILING. PER PDI-WH 201 AND |
| | MANUF. INSTALLATION INSTRUCTIONS. |
| | 3) DELIVERY PERSSURE OF 2LBS WILL ALLOW |
| | 11,415,000 BTU'S. ON 1-1/4" PIPE. MAY |
| | I SUGGEST A 1/2 LB. SYSTEM THAT WILL |
| | ALLOW 950,OOO BTU'S FOR 1-1/4" PIPE, AND |
| | YOU WILL NOT NEED REGULATORS FROM 2LBS. |
| | 4) FROM PREVIOUS REVIEW:******** |
| | A. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND THE |
| | FBC-2001 FUEL GAS CODE SEC 402.2 |
| | B. EMERGENCY HOOD SHUT DOWN SHUT OFF |
| | VALVE TO BE BELOW CEILING. MANUAL SHUT |
| | OFF VALVE TO BE UPSTREAM. UNION TO BE |
| | DOWN STREAM OF MANUAL VALVE. |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 659-8096 EXT 8377 |