Plan Review Notes
Plan Review Notes For Permit 02111251
Permit Number 02111251
Review Stop P
Sequence Number 1
Notes
Date Text
2002-12-14 00:00:00DENIED
 REFERENCE: FBC-2001 PLUMBING
 FBC-2001 FUEL GAS
 FBC-2001 CHAPTER 11
  
 1) PLANS SHALL BE ROUTED TO DEPT. OF
 BUSINESS REGULATION HOTEL & RESTURANT
 DIVISION (954) 956-5692 PRIOR TO RE-
 SUBMITTING TO CITY OF WPB FOR REVIEW.
 2) GREASE TRAP SHALL BE SIZED BY UTILITY
 DEPT., WASTE ORD. #2938-96. PLEASE CON-
 TACT RODNEY COMPO ENVIRONMENTAL COMPLI-
 ANCE (561) 837-4074.
 3) RPZ BACKFLOW IS REQUIRED FOR WATER
 SERVICE TO RESTURANT. MAX 4' ABOVE FLOOR
 FOR SERVICE AND CERTIFICATION.
 4) SHT A100 TOILET ROOMS SHALL COMPLY
 WITH SECTION 11-4.22. SHOW CLEAR FLOOR
 SPACE, AND UNOBSTRUCTED 5' TURNING RAD-
 IUS. 11-4.22.3. DOOR SHALL NOT OPEN INTO
 THE CLEAR FLOOR SPACE OR TURNING RADIUS
 OF ANY FIXTURE. SECTION 11-4.22.2.
 SEC 11-4.16 AND ALL SUBSECTIONS -
 SEC 11-4.19 AND ALL SUBSECTIONS - PLEASE
 PROVIDE DETAILS FOR COMPLIANCE.
 5) SHTS P100 & P101, FLOOR SINKS ARE RE-
 QUIRED FOR ALL INDIRECT WASTE. 802.3
 FLOOR DRAINS ARE NOT AN APPROVED INDIR-
 ECT WASTE RECEPTOR.
 6) SHTS P100 & P101 DISHWASHER SHALL
 DRAIN INTO THE SANITARY SYSTEM NOT THE
 GREASE LINE PER UTILITY DEPT.
 7) SHTS P100P101 WATER RISER DIAGRAM.
 WATER HAMMER ARRESTORS ARE REQUIRED AT
 ALL QUICK CLOSING VALVES, (ICE MACHINE,
 DISHWASHER) PER 406.9. THE LOCATION
 SHALL BE IN AN "EFFECTIVE RANGE" NEAR
 THE FIXTURE, NOT AT THE TOP OF THE DROP
 IN CEILING PER PDI-WH 201 AND MANUFACT-
 URE INSTALLATION INSTRUCTIONS.
 8) SHTS P100 & P101 VENT REQUIRED FOR
 GREASE LINE AS IT ENTERS BLDG TO VENT
 GREASE TANK.
 9) THE FOLLOWING COMMENTS ARE FOR THE
 NATURAL GAS SYSTEM. INFORMATION REQUIRED
 FOR GAS PERMIT APPLICATION. (SEPARATE
 PERMIT REQUIRED)
 1. SUBMIT AN ISOMETRIC DRAWING THAT
 CLEARLY SHOWS ALL CUT SECTIONS OF PIPE
 AND CORRESPONDING LENGTHS PER FBC-2001
 GAS CODE.
 2. SHOW TYPE OF PIPING MATERIAL BEING
 INSTALLED, ALL PIPE SIZES, (AND THE EDH
 NUMBER OF CORRUGATED STAINLESS STEEL
 TUBING FOR EACH PIPE SIZE BEING USED.
 4. BTU LOAD OF EACH APPLIANCE AND THE
 TOTAL BTU LOAD ON THE SYSTEM. REFER TO
 FBC-2001 FUEL GAS CODE SEC. 401.8 THRU
 402.5.2 & TABLES 402(1) THRU 402(34).
 5. SHOW THE DISTANCE FROM THE POINT OF
 DELIVERY, (METER), TO THE MOST REMOTE
 OUTLET IN THE BUILDING AND/OR SYSTEM PER
 FBC-2001 FUEL GAS CODE APPENDIX A - USE
 OF CAPACITY TABLES (A)(3).
 7. INDICATE THE DELIVERY PRESSURE (PSI)
 PER FBC-2001 FUEL GAS CODE SEC 402.2. IF
 NATURAL GAS SPECIFY .5 PSI OR 2 PSI.
 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS
 EQUIPMENT TO VERIFY COMPLIANCE WITH
 STANDARDS NFPA 54, NFPA 58, AND FBC-2001
 FUEL GAS CODE SEC. 402.2
 12. EMERGENCY HOOD SHUT DOWN SHUT OFF
 VALVE TO BE BELOW CEILING. MANUAL SHUT
 OFF VALVE TO BE UPSTREAM. UNION TO BE
 DOWN STREAM OF MANUAL VALVE.
  
 REVIEW BY KEN STEVENS
 (561) 659-8096 EXT 8377


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved