| Plan Review Notes For Permit 02110226 |
| Permit Number |
02110226 |
|
| Review Stop |
R |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2003-03-07 00:00:00 | SUBMITTAL CHECKLIST: | | | 1-ARCHITECT NEEDS TO REVIEW ENGINEERING | | | CALCULATIONS AND REVISE THE DIAPHRAGM | | | SCHEDULE AS REQUIRED. | | | 2-SHEET A-3: REVISE RIGHT ELEVATION TO | | | MATCH BUILDING SECTION A/A3.TOP OF | | | BB WAS RAISED TO AVOID ONE HR ASSEMBLY | | | AT TRUSS HEEL AREA AT ZERO LOT LINE | | | WALL. | | | 3-SHEET S-2: DETAIL 8/S2 WAS INCORRECTLY | | | KEYED. SEE 2ND FLOOR FRAMING PLAN AND | | | REVISE AS REQUIRED. | | | 4-PROVIDE COMPLETE INFORMATION FOR STORM | | | SHUTTERS UNDER A SEPARATE PERMIT AS | | | REQUESTED ON PROVISO DATED 12-10-02. | | | 5-PROVIDE COMPLETE INFORMATION ON DETAIL | | | 41/S1. NEED COMPLETE ANCHOR SIZE AND | | | WASHER. SEC. 104.2.1.2 CITY AMENDMENTS | | | TO FBC 2001. |
|