| Date |
Text |
| 2003-06-03 00:00:00 | BUILDING DENIED |
| | |
| | 1) THE LETTER FROM PALM BEACH LIFTS IS |
| | REQUIRED TO HAVE AN ORIGINAL SIGNATURE |
| | AND BE NOTARIZED. |
| | |
| | 2) THE STORM PANEL INSTALLATION LETTER |
| | IS REQUIRED TO BE ADDRESSED TO THE |
| | BUILDING OFFICIAL (NEIL MELICK). IT IS |
| | REQUIRED TO BE FROM A PRINCIPAL OF THE |
| | COMPANY. IT MUST BE SIGNED AND NOTARIZED |
| | OR HAVE THE CORPORATE SEAL. |
| | |
| | 3) THE COVER LETTER INDICATES THAT THE |
| | SIDELITES AT THE ENTRY DOORS FOR BOTH |
| | THE FIRST AND SECOND FLOOR UNITS ARE |
| | REQUIRED TO HAVE STORM PANELS. THE PRE- |
| | STORM PLAN AND THE CONDO DOCUMENTS DO |
| | NOT INDICATE THIS. THEY BOTH STATE THAT |
| | THE SECOND FLOOR UNITS HAVE IMPACT |
| | WINDOWS AND DOORS AND DO NOT REQUIRE |
| | STORM PANELS. THE SIDELIGHT OF THE ENTRY |
| | DOORS TO THE SECOND FLOOR UNITS THAT ARE |
| | REQUIRED TO BE SHUTTERED MUST BE |
| | ADDRESSED. THE LETTER, THE PREPARATION |
| | PLAN AND THE CONDO DOCUMENTS MUST ALL BE |
| | IN AGREEMENT. |
| | |
| | 4) THE ENERGY CALCULATION FORM FOR UNIT |
| | "D" IS NOT INDICATED AS WORST CASE. THIS |
| | WILL REQUIRE THE FORM FOR THIS ONE UNIT |
| | TO HAVE THE SITE LOCATION ON THE FORM & |
| | TO BE SUBMITTED WITH EACH BUILDING |
| | PERMIT APPLICATION. |
| | THE PERSON PREPARING THE ENERGY CALCS. |
| | ARE REQUIRED TO SIGN AND DATE THEM. |
| | |
| | 5) A SIGNED AND SEALED COPY OF THE SOIL |
| | REPORT IS REQUIRED. |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |