| 2003-10-02 00:00:00 | ************ UNSAT ****************** |
| | |
| | THIS IS RESPONSE TO RESPONSE LETTER |
| | DATED 6/26/03 |
| | |
| | PANEL 2LS/A HAS NOW BEEN CORRECTED. |
| | 1)NOTE: PLEASE SEE CONDUCTORS SHOWN ON |
| | RISER DIAGRAM COMING FROM TRANSFORMER |
| | TO PANEL 2LS/A 4-1#8 ETC, CLARIFY SIZES |
| | INTO A 40A BRKR. |
| | |
| | 2)NOTE: IT IS NOTED AND KNOWN THAT |
| | GENERATOR IS NOT IN A SEPARATE BLDG. |
| | THE NOTE AND CODES REFERENCE WAS FOR |
| | MEANS OF DISCONNECTING POWER COMING FROM |
| | GENERATOR TO THIS ACTIVITY BLDG.225.31 |
| | PLEASE SEE THAT ATS APPEARS TO NOW SHOW |
| | A 400A MCB FOR THE MEANS OF DSIC. |
| | PLEASE SEE THAT THIS IS ON SECOND FLOOR |
| | AND NEEDS TO HAVE DISCONNECTING MEANS |
| | "GROUPED" WITH 2MDP. |
| | SHEET 3.01 IS NOW SUBMITTED AND THIS |
| | SHEET REFERENCES WHAT APPEARS TO BE |
| | TWO "SHUNT TRIP'S". PLEASE SEE THAT |
| | SHUNT TRIPS ARE NOT CONSIDERED TO BE |
| | "RATED" FOR THE LOAD SERVED. 230.76 AND |
| | 230.79. |
| | |
| | 3)NOTE: PLEASE SEE ATTACHED COPY OF |
| | FS 553.80(2)(B). PLEASE SEE THAT WITH |
| | RESPECT TO DESIGN PROFESSIONAL(S) A |
| | 4X FEE WILL BE ACCESSED FOR THE PORTION |
| | ATTRIBUTED TO PLAN REVIEW. |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-805-6717 |
| | [email protected] |