| Plan Review Notes For Permit 02100865 |
| Permit Number |
02100865 |
|
| Review Stop |
R |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2002-12-20 00:00:00 | BUILDING PROVISO | | | | | | 1) PROVIDE A SOIL TEST REPORT INDICATING | | | THE SAFE BEARING CAPACITY OF THE SOIL | | | THAT IS SIGNED AND SEALED BY A FL SOIL | | | ENGINEER PRIOR TO POURING FOUNDATION PER | | | L. HATTEN. SEE CITY OF WPB AMENDMENTS TO | | | FBC 1804.2.2. | | | | | | 2) PROVIDE SIGNED AND SEALED SHOP | | | DRAWINGS OF GUARDRAILS AT EXTERIOR | | | BALCONY PRIOR TO INSTALLATION. | | | | | | 3)PROVIDE (2) CURRENT AND COMPLETE | | | COPIES OF SBCCI OR METRO-DADE PRODUCT | | | APPROVALS FOR: | | | - DOUBLE OUTSWING FRENCH DOORS ( THE | | | DRAWINGS THAT WERE SUBMITTED HAVE NOA | | | NOS. THAT DIFFER FROM THE COVER SHEET) | | | | | | 4) PROVIDE THE LISTING INFORMATION AND | | | MANUFACTURER'S SPECIFICATIONS FOR THE | | | ONE HOUR FIRE GLASS BLOCK ASSEMBLY. | | | | | | 5) SUBMIT A REVISED STORM PANEL | | | INSTALLATION SCHEDULE INDICATING THE | | | PROPER FASTENERS FOR ATTACHMENT TO THE | | | SECOND FLOOR WOOD FRAME. |
|