| 2002-11-20 00:00:00 | ***************** UNSAT ************* |
| | |
| | 1)NOTE: PLEASE NOTE IN RESPONSE LETTER, |
| | NOTE#2 MENTIONS MAIN DISC`S HAVE BEEN |
| | REVISED. PLEASE NOTE THAT DISC`S ARE THE |
| | SAME AS BEFORE AND ALL LOAD CALCULATIONS |
| | HAVE BEEN REVISED. PLEASE NOTE LOAD |
| | HAVE NOW BEEN CUT IN HALF OF PREVIOUS |
| | LOADS. |
| | PLEASE SHOW LOAD CALCUALTIONS PER NEC |
| | 220-3,220-10,220-11,220-13 AND CONTINU- |
| | -UOS LOADS PER 215-3,230-42. |
| | |
| | 2)NOTE:PLEASE NOTE, A/C HEAT-STRIP ARE |
| | NOW SHOWN AT 7.5KW AND STILL SHOWN AS |
| | 10KW ON MECH PLANS? PLEASE CORRELATE. |
| | PLEASE SEE MAX OCP FOR 7.5KW. |
| | |
| | 3)NOTE: PLEASE NOTE, PANEL SCHEDULES |
| | ARE SHOWING THE REQ`D SIGN CIRCUIT PER |
| | 600-5, BUT PLEASE SHOW LOCATION ON PLAN. |
| | |
| | 4)NOTE: PLEASE NOTE, CIRCUITING IS NOW |
| | SHOWN, PLEASE SEE 700-12E FOR CIRCUITING |
| | OF EM LTS AND EX LTS. |
| | |
| | 5)NOTE: PLEASE NOTE, PANEL SCHEDULE BAR |
| | SHOWS PANELS AS BEING MCB AND RISER SHOW |
| | S A TYPICAL AS MLO.? PLEASE CORRELATE. |
| | |
| | 6)NOTE: PLEASE SEE 210-62 FOR LOCATION |
| | OF SHOW WINDOW RECEPT. |
| | |
| | 7)NOTE: PLEASE CLARIFY CIRCUTIS 6&8 FOR |
| | PANEL "A", SHOWN AS GFI? |
| | PLEASE ALSO CLARIFY AND CORRELATE ALL |
| | CIRCUITING ON PLANS WITH PANEL SCHEDULE |
| | PLEASE SEE PANEL, CIRCUITS SHOWN BUT |
| | NOT ON PLANS. |
| | PLEASE CLARIFY LT CIRCUIT ON SIDE OF |
| | BLDG. EACH LT COMING FROM A DIFFERENT |
| | UNIT? THIS A JUST A NOTE, |
| | |
| | PLEASE SUBMIT THE ABOVE INFORMATION FOR |
| | REVIEW. IF THERE ARE ANY QUESTIONS, |
| | PLEASE CALL. |
| | |
| | DEWEY PALMER |
| | ELECTRICAL PLAN REVIEW |
| | 561-659-8096 EXT 8372 |