| Date |
Text |
| 2002-10-30 00:00:00 | BUILDING DENIED |
| | |
| | 1) IMPACT FEES MUST BE PAID TO PALM |
| | BEACH COUNTY, PLANS STAMPED BY THEM AND |
| | COPY OF RECEIPT SUBMITTED TO CITY OF |
| | WEST PALM BEACH BUILDING DEPARTMENT, |
| | BEFORE A BUILDING PERMIT CAN BE ISSUED. |
| | |
| | 2) A RECORDED COPY OF THE NOTICE OF |
| | COMMENCEMENT MUST BE SUBMITTED BEFORE A |
| | PERMIT CAN BE ISSUED. |
| | |
| | 3) PROVIDE COMPLETE SOIL TEST REPORT |
| | SIGNED AND SEALED BY SOIL ENGINEER. |
| | |
| | 4) INDICATE ON THE PLANS THE DRAFTSTOP |
| | LOCATIONS AND MATERIALS FOR THE FLOOR/ |
| | CEILING ASSEMBLY REQUIRED BY 2001 FBC |
| | SEC. 2305.2.2. |
| | |
| | 5) REVISE OPENING SIZE OF SECOND FLOOR |
| | ATTIC ACCESS TO COMPLY WITH FBC 2309.6. |
| | |
| | 6) PROVIDE CALCULATIONS WHICH INDICATE |
| | THAT THE REQUIRED NET FREE VENTILATING |
| | AREA WILL BE PROVIDED BY AREAS WITHOUT |
| | STYROFOAM TRIM. SEE FBC 2309.7.1. |
| | |
| | 7) PROVIDE A STRUCTURAL PLAN FOR THE |
| | STAIRS INDICATING HOW STAIRS AND LANDING |
| | WILL BE SUPPORTED. |
| | |
| | 8) PROVIDE A STAIR SECTION INDICATING |
| | THE LOCATION AND MATERIALS USED FOR |
| | FIREBLOCKING. FBC 2305.1.4. |
| | |
| | 9) REVISE WOOD STAIR DETAIL ON A12 FOR |
| | HANDRAIL GRASPABILITY. SEE FBC 1007.5.3 |
| | DO NOT SITE CODE SECTIONS. PROVIDE |
| | SPECIFIC INFORMATION AS REQUIRED BY FBC |
| | 104.2.1. |
| | |
| | 10)SPECIFY ONE HOUR RATED GLASS BLOCK AT |
| | ZERO LOT LINE. REVISE GLASS BLOCK DETAIL |
| | ON A12 TO ONE HOUR RATED INSTALLATION. |
| | |
| | 11) SPECIFY THE SIZE OF THE WASHERS FOR |
| | THE TAPCONS FOR THE GARAGE DOOR BUCK ON |
| | A12. |
| | |
| | 12) SPECIFY SUPPORTS AND SPACING FOR THE |
| | WWM IN THE CONCRETE SLAB. FBC 1909.3 |
| | |
| | 13) PROVIDE STRUCTURAL DETAIL FOR THE |
| | BOLLARD OR 3" STEEL POST AT GARAGE. |
| | |
| | 14) PROVIDE A LINTEL SCHEDULE FOR THE |
| | PRECAST LINTEL BETWEEN THE FRONT DOOR |
| | AND TRANSOM AND ABOVE WINDOWS. |
| | |
| | 15) THE VENT OPENINGS IN THE GARAGE WALL |
| | ARE NOT ALLOWED IN A WALL ON A ZERO LOT |
| | LINE. PLEASE REVISE. |
| | |
| | 16) THE SURVEY DOES NOT MATCH THE PLANS |
| | AT THE REAR COVERED PATIO. PLEASE |
| | REVISE. |
| | |
| | 17) INDICATE THE CEILING FINISHES AT THE |
| | COVERED LANAI/PATIO AND ENTRY. IF WIRE |
| | LATH AND STUCCO, PROVIDE ATTACHMENT |
| | DETAILS. SEE ASTM C 926 & ASTM C 1063. |
| | |
| | 18) REVISE ROOF SHEATHING NAILING |
| | SCHEDULE. RING SHANK 8D NAILS ARE |
| | REQUIRED IN ZONE 3 FOR STRUCTURES WITH A |
| | MEAN ROOF HEIGHT OF 25'. |
| | |
| | 19) REVISE SWING DOOR BUCK DETAIL ON A12 |
| | TO COMPLY WITH FBC 1707.4.4.2. |
| | |
| | 20)PROVIDE (2) PRODUCT APPROVALS, KEY |
| | PLANS AND INSTALLATION SCHEDULES |
| | INDICATING THE SPECIFIC TYPES OF ANCHORS |
| | TO BE USED FOR STORM PANELS. |
| | |
| | 21) BASED ON THE WINDLOAD PRESSURES IN |
| | THE SCHEDULE ON A1 AND THE PRODUCT |
| | APPROVAL SUBMITTED, FIXED GLASS WINDOWS |
| | U,T,H1,A1,B1,L1,F1 AND W MUST HAVE 3/16" |
| | TEMPERED GLASS. PLEASE SPECIFY ON THE |
| | PLANS. |
| | |
| | 22) SAFTEY GLASS IS REQUIRED IN THE |
| | WINDOWS IN BATH #2 AND THE MASTER BATH |
| | PER FBC 2405.2. GLASS BLOCK IN MASTER |
| | BATH IS REQUIRED TO HAVE A MINIMUM |
| | UNIFORM FACE THICKNESS OF 0.25 INCH PER |
| | FBC 2405.2.2(5). |
| | |
| | 23) THE UPLIFT VALUE GIVEN FOR THE |
| | DOUBLE TA CONNECTOR IS INCORRECT. REFER |
| | TO CURRENT USP CATALOG AND REVISE. |
| | |
| | 24) THE PRODUCT APPROVAL FOR THE SGD IS |
| | MISSING PAGE 2 AND THE DRAWINGS DO NOT |
| | HAVE THE SAME NOA NUMBER AS THE APPROVAL |
| | |
| | 25) SEVERAL OF THE SINGLE HUNG WINDOWS |
| | ON THE PLANS EXCEED THE DESIGN WINDLOADS |
| | IN THE PRODUCT APPROVAL. |
| | |
| | 26) SPECIFY WHICH GLASS BLOCK MANUFACT- |
| | URER WILL BE USED AND PROVIDE LISTING |
| | SPECIFICATIONS FOR A ONE HOUR FIRE RATED |
| | ASSEMBLY. |
| | |
| | 27) PROVIDE PRODUCT APPROVAL OR SITE |
| | SPECIFIC ENGINEERING FOR DOUBLE OUTSWING |
| | DOORS. USE CITY OF WPB FORM. LOCATION OF |
| | JOB IS REQUIRED TO BE ON FORM. FORM MUST |
| | BE SIGNED AND SEALED BY THE DESIGNER OF |
| | RECORD IN ADDITION TO THE ENGINEER. |
| | PROVIDE TEST REPORTS FOR IMPACT IF 1.1F |
| | IS CHECKED. |
| | |
| | 28) PROVIDE (2) CURRENT AND COMPLETE |
| | COPIES OF SBCCI OR METRO-DADE PRODUCT |
| | APPROVALS FOR: |
| | - HORIZONTAL STRUCTURAL MULLIONS (THE |
| | ONES SUBMITTED ARE FOR VERTICAL |
| | APPLICATIONS ONLY |
| | |
| | ROBERT MCDOUGAL |
| | BLDG. PLAN REVIEW |
| | (561)659-8096 EXT.8202 |