| Plan Review Notes For Permit 02090928 |
| Permit Number |
02090928 |
|
| Review Stop |
P |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2003-03-22 00:00:00 | DENIED | | | REFERENCE: FBC-2001 CHAPTER 11 | | | FBC-2001 PLUMBING | | | FBC-2001 FUEL GAS | | | | | | 1) SHT U1 DRYWELL SHALL BE MINIMUM OF | | | 12" FROM BLDG SECTION 1503.4.4. SURFACE | | | WATER SHALL NOT DRAIN INTO DRYWELL. A | | | RELIEF VENT WILL BE REQUIRED AS LINE | | | ENTERS DRYWILL OR EXITS BLDG AT GROUND. | | | 2) SHT P-5, WHERE THE CONDENSATE DRAIN | | | PIPES FROM MORE THAN ONE UNIT ARE MANI- | | | FOLDED TOGETHER , THE PIPE OR TUBING | | | SHALL BE SIZED IN ACCORDANCE WITH AN | | | APPROVED METHOD. CONDENSATE WASTE AND | | | DRAIN LINES SHALL NOT DECREASE IN SIZE | | | FROM THE DRAIN PAN CONNECTION. | | | 3) PLEASE CLAIRFY USE FOR DEMUCKING | | | PUMP. IS THERE PIPING CONNECTED TO THE | | | PUMP? | | | 4) BACKFLOW PREVENTORS ARE REQUIRED FOR | | | EACH BLDG. ONLY ONE IS SHOWN. | | | 5) THREE COMMENTS CONCERNING GAS REVIEW | | | WERE NOT ADDRESSED. DO YOU WISH TO NOT | | | REVIEW GAS AT THIS TIME AND ADDRESS | | | THESE COMMENTS WHEN GAS PERMIT IS | | | APPLIED FOR? | | | | | | REVIEW BY KEN STEVENS | | | (561) 659-8096 EXT 8377 |
|