| Date |
Text |
| 2002-10-17 00:00:00 | DENIED |
| | REFERENCE: FBC-2001 CHAPTER 11 |
| | FBC-2001 PLUMBING |
| | FBC-2001 FUEL GAS |
| | |
| | 1) SHT P1, CONDENSATE SHALL NOT DRAIN |
| | INTO SANITARY. IT SHALL BE PIPED SEPAR- |
| | ATELY OUTSIDE OF BLDG AND TIED INTO |
| | STORM, CATCH BASIN, OR DRYWELL. A RELEIF |
| | VENT IS REQUIRED WHERE CONDENSATE EXITS |
| | BLDG. CONDENSATE SHALL TERMINATE MINIMUM |
| | OF 12" FROM BLDG. SEC 1503.4.4 FBC |
| | 2) PLEASE SUBMIT A CONDENSATE RISER DIA- |
| | GRAM. CALCULATE PIPE SIZE PER SECTION |
| | 307.2.2 FBC-2001 MECH. SHOW PIPE SIZE ON |
| | RISER DIAGRAM. |
| | 3) PLEASE SUBMIT A WATER RISER DIAGRAM. |
| | SHOW ALL PIPE SIZES AND WATER HAMMER |
| | ARRESTORS REQUIRED BY 604.9. LOCATE NEAR |
| | FIXTURE IN AN "EFFECTIVE RANGE" NOT IN |
| | CEILING AT TOP OF DROP. |
| | 4) PLEASE SUBMIT A SANITARY RISER DIAG- |
| | RAM. WITH ALL HORIZONTAL PIPING AND SIZE |
| | PLEASE SUBMIT IN AN ISOMETRIC FORM. |
| | 5) SHTS P1 & P4, RISERS AND FLOOR PLAN |
| | DO NOT MATCH. PLEASE CLAIRFY. |
| | 6) SHTS P1 & P4 INDIRECT WASTE FROM ICE |
| | MACHINE SHALL NOT DRAIN TO FLOOR DRAIN. |
| | FLOOR SINKS ARE REQUIRED FOR ALL INDIR- |
| | ECT WASTE. SEC. 802.3 |
| | 7) SHT P4 RISER P3, HORIZONTAL DRY VENTS |
| | ARE NOT APPROVED, (AT FLOOR DRAIN). SECS |
| | 905.3 & 905.4 |
| | 8) SHT P4 RISER P3, DOES NOT REFLECT |
| | FLOOR PLAN. FITTING SHOW DIRECTION OF |
| | FLOW TO THE RIGHT, (3" PIPE), AND 4" |
| | PIPE IS TO THE LEFT. ALSO FLOOR PLAN |
| | SHOWS RISERS P7 & P2 TYING INTO BLDG |
| | DRAIN (P3) BETWEEN URNAL AND W/C BUT NOT |
| | REFLECTED ON RISER. THIS CAN BE CORRECT- |
| | ED BY SUBMITTING COMPLETE SANITARY RISER |
| | DIAGRAM REQUESTED IN COMMENT #4 AS THE |
| | RISERS SHOWN ARE NOT ACTUAL ISOMETRIC |
| | RISER DIAGRAMS. |
| | 9) SHT P3 SAND/0IL INTECEPTOR DETAIL, |
| | PLEASE CONTACT ROD COMPO, ENVIRONMENTAL |
| | COMPLIANCE MANAGER FOR SIZE OF INTECEPT- |
| | OR. (561) 837-4074 - ALSO MINIMUM WALL |
| | SIZE SHALL BE 3", AND BOTTOM SHALL BE 4" |
| | PLEASE SHOW ON DETAIL. |
| | 10) PLEASE CLAIRFY USE FOR DEMUCKING |
| | PUMP. IS THERE PIPING CONNECTED TO THIS |
| | PUMP. |
| | 11) SHT P3, HORIZONTAL DRY VENT FOR |
| | FLOOR SINK NOT APPROVED. SECS 905.3 & |
| | 905.4 |
| | 12) BACKFLOWS ARE REQUIRED FOR EACH BLDG |
| | 13) FOLLOWING GAS PERMIT APPLICATION |
| | REQUIREMENTS. |
| | 1. SUBMIT AN ISOMETRIC DRAWING THAT |
| | CLEARLY SHOWS ALL CUT SECTIONS OF PIPE |
| | AND CORRESPONDING LENGTHS PER FBC-2001 |
| | GAS CODE. |
| | 2. SHOW TYPE OF PIPING MATERIAL BEING |
| | INSTALLED, ALL PIPE SIZES, (AND THE EDH |
| | NUMBER OF CORRUGATED STAINLESS STEEL |
| | TUBING FOR EACH PIPE SIZE BEING USED. |
| | 3. TYPE OF GAS, (LP OR NATURAL) |
| | 4. BTU LOAD OF EACH APPLIANCE AND THE |
| | TOTAL BTU LOAD ON THE SYSTEM. REFER TO |
| | FBC-2001 FUEL GAS CODE SECS.401.8 THRU |
| | 402.5 AND TABLES 402(2) THRU 402(34). |
| | 5. SHOW THE DISTANCE FROM THE POINT OF |
| | DELIVERY, (METER), TO THE MOST REMOTE |
| | OUTLET IN THE BUILDING AND/OR SYSTEM PER |
| | FBC-2001 FUEL GAS CODE APPENDIX A - USE |
| | OF CAPACITY TABLES (A)(3). |
| | 6. SUBMIT CALCULATIONS FOR COMBUSTION |
| | AIR (IF APPLICABLE) PER FBC-2001 FUELGAS |
| | CODE SEC. 304. |
| | 7. INDICATE THE DELIVERY PRESSURE (PSI) |
| | PER FBC-2001 GAS CODE SEC. 402.2. IF |
| | NATURAL GAS SPECIFY .5 PSI OR 2 PSI. |
| | 8. SUBMIT A DETAIL SHOWING THE TYPE, |
| | LOCATION, SIZE AND TERMINATION OF THE |
| | GAS VENTS PER FBC-2001 FUEL GAS CODE SEC |
| | 304. |
| | 9. SUBMIT MANUFACTURE SHEETS FOR ALL GAS |
| | EQUIPMENT TO VERIFY COMPLIANCE WITH |
| | STANDARDS NFPA 54, NFPA 58, AND FBC-2001 |
| | FUEL GAS CODE SEC. 402.2 |
| | 10. CLEARLY SHOW THE LOCATION AND CAP- |
| | ACITY OF LP TANK(S), TYPE OF TANK (DOT |
| | OR ASME), THE DISTANCE OF THE TANK FROM |
| | THE BUILDING AND ADJACENT PROPERTY LINES |
| | THE DISTANCE OF THE TANK FROM ALL SOUR- |
| | CES OF IGNITION, OTHER CONTAINERS, BUILD |
| | INGS, AND THE LOCATION OF ANY BUILDING |
| | OPENINGS BELOW THE RELIEF VALVE OF THE |
| | TANK PER NFPA 58, TABLE 3-2.2.2. |
| | 11. CLEARLY INDICATE ON THE PLAN IF THE |
| | LP TANK IS ABOVE OR BELOW GROUND, AND |
| | SHOW REQUIRED PROTECTION OF THE TANK AND |
| | APPURTENANCES PER NFPA 58. IF THE TANK |
| | IS BELOW GROUND THE CONTAINER SHALL BE |
| | SECURILY ANCHORED PER NFPA 58 SECTION |
| | 3-2.2.7(H). |
| | |
| | REVIEW BY KEN STEVENS |
| | (561) 659-8096 EXT 8377 |